Catalogue / Flue-gas desulphurisation (FGD)
Gypsum dewatering system, Elite seriesSample
by Coorg Enviro Engineers (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Coorg Enviro Engineers (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Gypsum dewatering system from Coorg, Elite series: 6 boiler size options between 10 MW and 350 MW. Highlights: mist eliminators for droplet control, online SO2 analyser interface and reagent preparation system included. Suited to industrial boilers, coal fired thermal plants and captive power plants. Designed and tested to MoEF&CC notification 2015, IS 11255 and CPCB norms. Lead time 24-36 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Coorg
- Model
- COO-235 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 1 set
- Lead time
- 24-36 weeks
- Warranty
- 24 months performance guarantee
- Standards
- MoEF&CC notification 2015, IS 11255, CPCB norms
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Boiler size10 MWCOO-235-01 | Boiler size: 10 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size25 MWCOO-235-02 | Boiler size: 25 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size60 MWCOO-235-03 | Boiler size: 60 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size120 MWCOO-235-04 | Boiler size: 120 MW | 1 set · 24-36 weeks | for verified buyers |
| Boiler size210 MWCOO-235-05 | Boiler size: 210 MW | 1 set · 40-60 weeks | for verified buyers |
| Boiler size350 MWCOO-235-06 | Boiler size: 350 MW | 1 set · 40-60 weeks | for verified buyers |
Specifications
| Boiler size | 10 MW to 350 MW (see variants) |
|---|---|
| Technology | Dry sorbent |
| SO2 removal efficiency | 90% |
| Inlet SO2 | Up to 1500 mg/Nm3 |
| Absorber material | Rubber lined carbon steel |
| Reagent | Lime |
| Gypsum quality | Saleable grademade to order: Disposal grade |
| Water consumption | Standardmade to order: Low |
| Control | DCS integrated |
| Chimney | Wet stack liner |