Catalogue / Factory acceptance test (FAT) witnessing

No photo yet

FAT witnessing for inverters and PCS, Edge seriesSample

by Deccan Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

FAT witnessing for inverters and PCS from Deccan, Edge series: 3 equipment value options between INR 5 crore and INR 25 crore. Design: calibration cross-check of factory instruments, test curves and data captured and defect and observation log. Typically used for EPC and OEM contracts, BESS projects and utility procurement. Delivered in line with IEC 60076, IEC 62271 and IEC 62109. Mobilisation Report within 2 days of test; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Deccan
Model
DEC-A29 series
Listing type
Service
Unit
day
Minimum order
1 day
Lead time
Report within 2 days of test
Warranty
As per contract
Standards
IEC 60076, IEC 62271, IEC 62109
Delivers to
North India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Equipment valueINR 5 croreDEC-A29-01Equipment value: INR 5 crore1 day · Report within 2 days of testfor verified buyers
Equipment valueINR 10 croreDEC-A29-02Equipment value: INR 10 crore1 day · Report within 2 days of testfor verified buyers
Equipment valueINR 25 croreDEC-A29-03Equipment value: INR 25 crore1 day · Report within 2 days of testfor verified buyers

Specifications

Equipment valueINR 5 crore to INR 25 crore (see variants)
Test planClient approved FAT protocol
Tests witnessedRoutine tests per IS or IEC
TeamLead engineer and assistantmade to order: Specialist engineers per discipline
LocationInternational factory
Documentation reviewFull documentation check
DeliverableReport with punch listmade to order: FAT report with release note
Remote witnessVideo witness availablemade to order: Physical only
Turnaround24-48 hoursmade to order: 3-5 days
Hold pointsPer ITPmade to order: Customer defined
TravelExtra at actuals

BARREL: Bharat Atom Renewable Resources Energy Limited