Merchants / DECCANENGINEERINGS

Deccan Engineering Services (Sample)

Deccan Engineering Services Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 20 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Factory acceptance test (FAT) witnessing

FAT witnessing for inverters and PCS, Edge series

SampleServiceFactory acceptance test (FAT) witnessing

Deccan · DEC-A29 series

Equipment value
INR 5 crore to INR 25 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine tests per IS or IEC
Team
Lead engineer and assistant
Location
International factory

Lead time Report within 2 days of test · Warranty As per contract · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

FAT witnessing for inverters and PCS, Max 2 series

SampleServiceFactory acceptance test (FAT) witnessing

Deccan · DEC-A23 series

Equipment value
INR 1 crore to INR 10 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine tests per IS or IEC
Team
Lead engineer and assistant
Location
International factory

Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price on quote

invoiced by BARREL

Request quote

Site acceptance & pre-commissioning tests

Site acceptance testing for solar plants, Edge 9 series

SampleServiceSite acceptance & pre-commissioning tests

Deccan · DEC-241 series

Plant size
10 MW to 100 MW (see variants)
Scope
Electrical pre-commissioning
Instruments
Relay test set, IV tracer, CRM
Test sequence
Per client approved format
Team
Test engineer plus 2 technicians

Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Site acceptance testing for solar plants, Duo series

SampleServiceSite acceptance & pre-commissioning tests

Deccan · DEC-244 series

Plant size
1 MW to 100 MW (see variants)
Scope
Solar SAT
Instruments
Insulation tester, earth tester
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Feasibility studies & DPR

Captive power and open access feasibility, Titan series

SampleServiceFeasibility studies & DPR

Deccan · DEC-D54 series

Project capacity
10 MW to 1 GW (see variants)
Scope
Bankable DPR
Energy yield
WAsP wind energy assessment
Financial model
Sensitivity and tariff analysis
Grid assessment
Nearest substation capacity check

Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Technical, legal & financial due diligence

Financial due diligence for energy platforms, Edge series

SampleServiceTechnical, legal & financial due diligence

Deccan · DEC-1B9 series

Portfolio size
25 MW to 1 GW (see variants)
Scope
Financial
Site visit
All sites above 10 MW
Legal items
Litigation and compliance check
Financial items
Revenue, receivables, tax

Lead time 3-8 weeks · Warranty Clarifications until deal closing · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Tariff & regulatory advisory

Compliance advisory for grid code and RPO, Smart 3 series

SampleServiceTariff & regulatory advisory

Deccan · DEC-F95 series

Matter complexity
Complex petition to Appeal before APTEL (see variants)
Forum
APTEL
Deliverable
Petition with annexures
Representation
Appearance before Commission
Data support
Benchmark analysis

Lead time Petition 4-8 weeks · Warranty As per engagement letter · MOQ 1 case

Price on quote

invoiced by BARREL

Request quote

Compliance advisory for grid code and RPO, Plus 6 series

SampleServiceTariff & regulatory advisory

Deccan · DEC-F91 series

Matter complexity
Simple petition to Appeal before APTEL (see variants)
Forum
CERC
Deliverable
Opinion note
Representation
Drafting only
Data support
Cost data and tariff model

Lead time Petition 4-8 weeks · Warranty Free redrafting if Commission raises defects · MOQ 1 case

Price for verified buyers

invoiced by BARREL

Request quote

Electrical safety audits

Statutory electrical compliance audit, Eco series

SampleServiceElectrical safety audits

Deccan · DEC-759 series

Installed load
10 MVA to 50 MVA (see variants)
Scope
Visual and documentation audit
Auditor
CEA-licensed engineer
Measurements
Thermography and power quality
Report
Action plan with timeline

Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Statutory electrical compliance audit, Smart series

SampleServiceElectrical safety audits

Deccan · DEC-758 series

Installed load
500 kVA to 5 MVA (see variants)
Scope
Audit with measurements
Auditor
CEA-licensed engineer
Measurements
Thermography and power quality
Report
Findings with risk rating

Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price on quote

invoiced by BARREL

Request quote

Product certification (BIS, IEC, ALMM)

IEC certification support for power equipment, Core 2 series

SampleServiceProduct certification (BIS, IEC, ALMM)

Deccan · DEC-B83 series

Certification scope
IEC 61215 and 61730 to Full global set (see variants)
Standards covered
IS 14286 and IS 16077
Application support
End-to-end with lab liaison
Test lab liaison
NABL accredited labs
Factory audit
BIS inspection support

Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price on quote

invoiced by BARREL

Request quote

Resource assessment (solar, wind, hydro)

Hydro resource and flow duration study, Elite series

SampleServiceResource assessment (solar, wind, hydro)

Deccan · DEC-C84 series

Measurement duration
3 months to 18 months (see variants)
Technology
Wind
Data source
Hybrid with MCP
Equipment
80-120 m met mast with LiDAR
Uncertainty
P50/P90 with uncertainty budget

Lead time Desktop in 2-3 weeks · Warranty As per contract · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Hydro resource and flow duration study, Prime series

SampleServiceResource assessment (solar, wind, hydro)

Deccan · DEC-C89 series

Measurement duration
3 months to 12 months (see variants)
Technology
Small hydro
Data source
Satellite and reanalysis
Equipment
Class A pyranometer station
Uncertainty
Bankable assessment

Lead time Campaign 3-24 months · Warranty Data availability guarantee above 95% · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

EIA, ESG & environmental studies

Environmental and social management plan, Xtra series

SampleServiceEIA, ESG & environmental studies

Deccan · DEC-8B8 series

Project scale
Under 25 MW to 1 GW (see variants)
Study
Rapid EIA
Baseline season
One season
Deliverables
Final EIA with approvals
Lab testing
NABL accredited lab

Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Environmental and social management plan, Elite series

SampleServiceEIA, ESG & environmental studies

Deccan · DEC-8B8 series

Project scale
Under 25 MW to 100 MW (see variants)
Study
ESIA to IFC standards
Baseline season
One season
Deliverables
Draft EIA, EMP, public hearing support
Lab testing
In-house lab

Lead time 8-12 weeks, longer with seasonal baseline · Warranty As per contract · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Third-party inspection (TPI)

Solar module and inverter inspection, Elite 3 series

SampleServiceThird-party inspection (TPI)

Deccan · DEC-AE8 series

Inspection effort
1 man-day to 100 man-days (see variants)
Equipment inspected
Cables and conductors
Inspection stage
Final pre-dispatch
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day

Price on quote

invoiced by BARREL

Request quote

Solar module and inverter inspection, Ultra series

SampleServiceThird-party inspection (TPI)

Deccan · DEC-AE3 series

Inspection effort
5 man-days to 100 man-days (see variants)
Equipment inspected
PV modules and inverters
Inspection stage
Final pre-dispatch
Standards used
Per client specification
Inspector qualification
Level II NDT certified

Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day

Price on quote

invoiced by BARREL

Request quote

Type & routine testing laboratories (NABL)

Environmental and ingress protection testing, Prime 8 series

SampleServiceType & routine testing laboratories (NABL)

Deccan · DEC-9B3 series

Test class
Acceptance test to Short-circuit test (see variants)
Equipment under test
Switchgear
Accreditation
NABL plus BIS recognition
Rating range
Up to 33 kV
Test standard
Customer specific test plan

Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Lender's engineer & TEV studies

Construction monitoring for lenders, Flex series

SampleServiceLender's engineer & TEV studies

Deccan · DEC-EC4 series

Project cost
INR 250 crore to INR 2500 crore (see variants)
Phase
Construction monitoring
Scope
Technical, cost and schedule review
Reporting
Monthly progress report
Site visits
Quarterly

Lead time Appointment in 1 week · Warranty Report reliance letter to lenders · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Power system studies (load flow, short circuit, grid code)

Harmonic and power quality study, Neo 9 series

SampleServicePower system studies (load flow, short circuit, grid code)

Deccan · DEC-4B1 series

Network scale
66 kV system to 220 kV system (see variants)
Study type
Protection coordination
Software
PSS/E
Model data
Utility network model
Deliverables
Model files and relay settings

Lead time Kick-off in 1 week · Warranty Revision for utility comments · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited