Catalogue / Factory acceptance test (FAT) witnessing
FAT witnessing for inverters and PCS, Max 2 seriesSample
by Deccan Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
FAT witnessing for inverters and PCS from Deccan, Max 2 series: 3 equipment value options between INR 1 crore and INR 10 crore. Design: test curves and data captured, handover to dispatch inspection and calibration cross-check of factory instruments. Suited to EPC and OEM contracts, BESS projects and utility procurement. Delivered in line with IEC 60076, IEC 62271 and IEC 62109. Mobilisation Report within 2 days of test; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deccan
- Model
- DEC-A23 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report within 2 days of test
- Warranty
- Re-witness at no cost if protocol changes
- Standards
- IEC 60076, IEC 62271, IEC 62109
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Equipment valueINR 1 croreDEC-A23-01 | Equipment value: INR 1 crore | 1 day · Report within 2 days of test | on quote |
| Equipment valueINR 5 croreDEC-A23-02 | Equipment value: INR 5 crore | 1 day · Report within 2 days of test | on quote |
| Equipment valueINR 10 croreDEC-A23-03 | Equipment value: INR 10 crore | 1 day · Report within 2 days of test | on quote |
Specifications
| Equipment value | INR 1 crore to INR 10 crore (see variants) |
|---|---|
| Test plan | Client approved FAT protocolmade to order: Based on tender specification |
| Tests witnessed | Routine tests per IS or IECmade to order: Routine plus special tests |
| Team | Lead engineer and assistantmade to order: Specialist engineers per discipline |
| Location | International factorymade to order: Domestic factory |
| Documentation review | Full documentation check |
| Deliverable | Report with punch list |
| Remote witness | Video witness availablemade to order: Physical only |
| Turnaround | 3-5 days |
| Hold points | Per ITP |
| Travel | Extra at actualsmade to order: Included |