Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Site acceptance testing for solar plants, Duo seriesSample

by Deccan Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Deccan Duo site acceptance testing for solar plants, offered in 6 plant size options from 1 MW to 100 MW. Highlights: final dossier for handover, defect register shared daily and support to CEIG inspection. Used by industrial substations, EPC handover and renewable parks. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Deccan
Model
DEC-244 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
On-site 3-21 days
Warranty
Retest at no cost on instrument error
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size1 MWDEC-244-01Plant size: 1 MW1 site · On-site 3-21 daysfor verified buyers
Plant size5 MWDEC-244-02Plant size: 5 MW1 site · On-site 3-21 daysfor verified buyers
Plant size10 MWDEC-244-03Plant size: 10 MW1 site · On-site 3-21 daysfor verified buyers
Plant size25 MWDEC-244-04Plant size: 25 MW1 site · On-site 3-21 daysfor verified buyers
Plant size50 MWDEC-244-05Plant size: 50 MW1 site · On-site 3-21 daysfor verified buyers
Plant size100 MWDEC-244-06Plant size: 100 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size1 MW to 100 MW (see variants)
ScopeSolar SATmade to order: Electrical pre-commissioning / Complete SAT with performance test
InstrumentsInsulation tester, earth testermade to order: Relay test set, IV tracer, CRM
Test sequenceVisual, mechanical, electrical
TeamTeam of 6 with lead
Duration on site10 daysmade to order: 3-5 days / 3 weeks
ReportsDigital dossier with photos
CalibrationNABL traceable
Witnessed byClient engineermade to order: Lender engineer or authority
Retest policyOne retest included
PaymentOn completion of report