Catalogue / Third-party inspection (TPI)
Solar module and inverter inspection, Elite 3 seriesSample
by Deccan Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Solar module and inverter inspection from Deccan, Elite 3 series: 6 inspection effort options between 1 man-day and 100 man-days. Design: hold and witness points per QAP, non-conformity reports with closure tracking and independent opinion for buyers. Typically used for utilities and PSUs, government procurement and EPC contractors and developers. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deccan
- Model
- DEC-AE8 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayDEC-AE8-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysDEC-AE8-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysDEC-AE8-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysDEC-AE8-04 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysDEC-AE8-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort100 man-daysDEC-AE8-06 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Cables and conductorsmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | Final pre-dispatch |
| Standards used | Per approved QAP |
| Inspector qualification | B.E. Electrical with 8 years experiencemade to order: Level II NDT certified |
| Accreditation | ISO/IEC 17020 body |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Domestic and export vendorsmade to order: Pan India |
| Sampling | AQL level II |
| Release note | Hard copy plus scan |
| Travel | Included in rate |