Catalogue / Resource assessment (solar, wind, hydro)
Hydro resource and flow duration study, Prime seriesSample
by Deccan Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Hydro resource and flow duration study from Deccan, Prime series: 3 measurement duration options between 3 months and 12 months. Highlights: extreme wind and wake studies, long-term correction using reference data and loss factors for local conditions. Used by hybrid project planners, lenders needing P90 and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deccan
- Model
- DEC-C89 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Campaign 3-24 months
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration3 monthsDEC-C89-01 | Measurement duration: 3 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration6 monthsDEC-C89-02 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration12 monthsDEC-C89-03 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | 3 months to 12 months (see variants) |
|---|---|
| Technology | Small hydro |
| Data source | Satellite and reanalysis |
| Equipment | Class A pyranometer stationmade to order: 80-120 m met mast with LiDAR |
| Uncertainty | Bankable assessmentmade to order: P50/P90 with uncertainty budget |
| Modelling | WAsP, WindPROmade to order: PVsyst, SAM |
| Deliverable | Resource reportmade to order: Hourly time series dataset |
| Calibration | Calibration pre and post campaign |
| Site count | Single sitemade to order: Multi-site comparison |
| Maintenance | Remote health checksmade to order: Quarterly site visit |
| Turnaround | Report in 3 weeks |