Catalogue / Electrical safety audits
Statutory electrical compliance audit, Eco seriesSample
by Deccan Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco service of statutory electrical compliance audit by Deccan covers 3 installed load options (10 MVA to 50 MVA). Highlights: earthing health and soil resistivity, fire exit and detection checks and risk-ranked findings. Typically used for data centres, hospitals and commercial buildings and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deccan
- Model
- DEC-759 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load10 MVADEC-759-01 | Installed load: 10 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load25 MVADEC-759-02 | Installed load: 25 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
| Installed load50 MVADEC-759-03 | Installed load: 50 MVA | 1 site · Audit in 1-2 weeks | for verified buyers |
Specifications
| Installed load | 10 MVA to 50 MVA (see variants) |
|---|---|
| Scope | Visual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Thermography and power qualitymade to order: Earth resistance, insulation |
| Report | Action plan with timeline |
| Statutory records | Permit-to-work audit |
| Sampling | Representative LV panelsmade to order: 100% of HV equipment |
| Follow-up | Close-out verificationmade to order: Re-audit after 3 months |
| Turnaround | 1-2 weeksmade to order: 3-4 weeks |
| Presentation | Report only |
| Accreditation | Government recognised agency |