Catalogue / Third-party inspection (TPI)
Solar module and inverter inspection, Ultra seriesSample
by Deccan Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Deccan Ultra solar module and inverter inspection, offered in 5 inspection effort options from 5 man-days to 100 man-days. Design: hold and witness points per QAP, quick mobilisation across India and independent opinion for buyers. Used by lender quality assurance, EPC contractors and developers and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deccan
- Model
- DEC-AE3 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort5 man-daysDEC-AE3-01 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysDEC-AE3-02 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysDEC-AE3-03 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysDEC-AE3-04 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort100 man-daysDEC-AE3-05 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 5 man-days to 100 man-days (see variants) |
|---|---|
| Equipment inspected | PV modules and invertersmade to order: Transformers and reactors / Switchgear and relays / Cables and conductors |
| Inspection stage | Final pre-dispatch |
| Standards used | Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 bodymade to order: Empanelled inspection agency |
| Report | Detailed report with photos in 48 hoursmade to order: Inspection release note |
| Coverage | Domestic and export vendors |
| Sampling | As per IS 2500 |
| Release note | Hard copy plus scan |
| Travel | At actuals |