Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Hydro resource and flow duration study, Elite seriesSample

by Deccan Engineering Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Deccan Elite hydro resource and flow duration study, offered in 4 measurement duration options from 3 months to 18 months. Highlights: long-term correction using reference data, independent bankable estimate and data quality control and filling. Used by state agencies mapping resource, hybrid project planners and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Deccan
Model
DEC-C84 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
As per contract
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement duration3 monthsDEC-C84-01Measurement duration: 3 months1 report · Desktop in 2-3 weekson quote
Measurement duration6 monthsDEC-C84-02Measurement duration: 6 months1 report · Desktop in 2-3 weekson quote
Measurement duration12 monthsDEC-C84-03Measurement duration: 12 months1 report · Campaign 3-24 monthson quote
Measurement duration18 monthsDEC-C84-04Measurement duration: 18 months1 report · Campaign 3-24 monthson quote

Specifications

Measurement duration3 months to 18 months (see variants)
TechnologyWind
Data sourceHybrid with MCPmade to order: Satellite and reanalysis / On-site measurement
Equipment80-120 m met mast with LiDAR
UncertaintyP50/P90 with uncertainty budget
ModellingWAsP, WindPROmade to order: PVsyst, SAM
DeliverableResource report
CalibrationTraceable calibrationmade to order: Calibration pre and post campaign
Site countMulti-site comparison
MaintenanceQuarterly site visitmade to order: Remote health checks
TurnaroundReport in 3 weeksmade to order: Report within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited