Catalogue / Resource assessment (solar, wind, hydro)
Hydro resource and flow duration study, Elite seriesSample
by Deccan Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Deccan Elite hydro resource and flow duration study, offered in 4 measurement duration options from 3 months to 18 months. Highlights: long-term correction using reference data, independent bankable estimate and data quality control and filling. Used by state agencies mapping resource, hybrid project planners and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deccan
- Model
- DEC-C84 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration3 monthsDEC-C84-01 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration6 monthsDEC-C84-02 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration12 monthsDEC-C84-03 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration18 monthsDEC-C84-04 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | 3 months to 18 months (see variants) |
|---|---|
| Technology | Wind |
| Data source | Hybrid with MCPmade to order: Satellite and reanalysis / On-site measurement |
| Equipment | 80-120 m met mast with LiDAR |
| Uncertainty | P50/P90 with uncertainty budget |
| Modelling | WAsP, WindPROmade to order: PVsyst, SAM |
| Deliverable | Resource report |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Multi-site comparison |
| Maintenance | Quarterly site visitmade to order: Remote health checks |
| Turnaround | Report in 3 weeksmade to order: Report within 6 weeks of data |