Catalogue / Electrical safety audits
Statutory electrical compliance audit, Smart seriesSample
by Deccan Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Statutory electrical compliance audit from Deccan, Smart series: 3 installed load options between 500 kVA and 5 MVA. Design: training recommendations for staff, earthing health and soil resistivity and compliance matrix against CEA safety rules. Typically used for data centres, hospitals and commercial buildings and solar and wind sites. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Report in 7-14 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deccan
- Model
- DEC-758 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 7-14 days
- Warranty
- Clarifications on report at no cost for 6 months
- Standards
- Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installed load500 kVADEC-758-01 | Installed load: 500 kVA | 1 site · Report in 7-14 days | on quote |
| Installed load1 MVADEC-758-02 | Installed load: 1 MVA | 1 site · Report in 7-14 days | on quote |
| Installed load5 MVADEC-758-03 | Installed load: 5 MVA | 1 site · Report in 7-14 days | on quote |
Specifications
| Installed load | 500 kVA to 5 MVA (see variants) |
|---|---|
| Scope | Audit with measurements |
| Auditor | CEA-licensed engineermade to order: Chartered engineer |
| Measurements | Thermography and power qualitymade to order: Earth resistance, insulation |
| Report | Findings with risk ratingmade to order: Action plan with timeline |
| Statutory records | Permit-to-work auditmade to order: Registers, test certificates, licence |
| Sampling | 100% of HV equipmentmade to order: Representative LV panels |
| Follow-up | Close-out verificationmade to order: Re-audit after 3 months |
| Turnaround | 3-4 weeksmade to order: 1-2 weeks |
| Presentation | Report onlymade to order: Findings to management |
| Accreditation | Government recognised agencymade to order: ISO/IEC 17020 body |