Catalogue / Site acceptance & pre-commissioning tests

No photo yet

Site acceptance testing for solar plants, Edge 9 seriesSample

by Deccan Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Deccan Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Deccan Edge 9 site acceptance testing for solar plants, offered in 4 plant size options from 10 MW to 100 MW. Design: instrument calibration certificates, checklist driven testing and support to CEIG inspection. Typically used for EPC handover, renewable parks and industrial substations. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation Mobilisation in 3-7 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Deccan
Model
DEC-241 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Mobilisation in 3-7 days
Warranty
Retest at no cost on instrument error
Standards
IEC 62446-1, IS 3043, IEC 61557
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant size10 MWDEC-241-01Plant size: 10 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size25 MWDEC-241-02Plant size: 25 MW1 site · Mobilisation in 3-7 daysfor verified buyers
Plant size50 MWDEC-241-03Plant size: 50 MW1 site · On-site 3-21 daysfor verified buyers
Plant size100 MWDEC-241-04Plant size: 100 MW1 site · On-site 3-21 daysfor verified buyers

Specifications

Plant size10 MW to 100 MW (see variants)
ScopeElectrical pre-commissioning
InstrumentsRelay test set, IV tracer, CRM
Test sequencePer client approved format
TeamTest engineer plus 2 techniciansmade to order: Team of 6 with lead
Duration on site10 daysmade to order: 3-5 days / 3 weeks
ReportsDigital dossier with photos
CalibrationCalibration certificates attached
Witnessed byClient engineermade to order: Lender engineer or authority
Retest policyOne retest included
Payment50% advancemade to order: On completion of report