Catalogue / Testing & commissioning
Pre-commissioning tests and energisation, Max seriesSample
by Deepmark Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deepmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Max service of pre-commissioning tests and energisation by Deepmark covers 4 plant capacity options (1 MW to 25 MW). Key features: test formats agreed before mobilisation, handover training to O&M team and commissioning certificates for lenders. Used by lender completion tests, EPC handover to owners and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation 1-2 weeks on site; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deepmark
- Model
- DEE-8F8 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- 1-2 weeks on site
- Warranty
- Retest at no cost if failure traced to test error
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWDEE-8F8-01 | Plant capacity: 1 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity5 MWDEE-8F8-02 | Plant capacity: 5 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity10 MWDEE-8F8-03 | Plant capacity: 10 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity25 MWDEE-8F8-04 | Plant capacity: 25 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 1 MW to 25 MW (see variants) |
|---|---|
| Tests covered | String IV curve, insulation, earth |
| Instruments | Calibrated IV tracer, megger, CRM |
| Calibration | NABL traceable certificatesmade to order: Calibration valid at test date |
| Team | Commissioning engineer plus 2 testersmade to order: Lead plus 5 member crew |
| Statutory support | DISCOM charging support |
| Reports | Commissioning dossier with as-built |
| Duration on site | 3-4 weeks |
| Performance guarantee test | 72-hour trial run |
| Grid code checks | Not includedmade to order: Reactive power and ramp rate |
| Payment | Milestone on energisationmade to order: 50% on start, 50% on report |