Merchants / DEEPMARKINFRASERVI

Deepmark Infra Services (Sample)

Deepmark Infra Services Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 30 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Packing & crating

Palletisation and shrink wrapping, Duo series

SampleServicePacking & crating

Deepmark · DEE-DD1 series

Packing volume
5 CBM to 500 CBM (see variants)
Material
Steel frames
Protection
Shock absorption foam
Marking
Project-specific labelling
Packing list
Itemised with weights

Lead time Large lots 10 days · Warranty As per terms · MOQ 1 lot

Price on quote

invoiced by BARREL

Request quote

Resource assessment (solar, wind, hydro)

Hydro resource and flow duration study, Smart series

SampleServiceResource assessment (solar, wind, hydro)

Deepmark · DEE-C84 series

Measurement duration
6 months to 24 months (see variants)
Technology
Small hydro
Data source
On-site measurement
Equipment
80-120 m met mast with LiDAR
Uncertainty
Bankable assessment

Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Hydro resource and flow duration study, Smart series

SampleServiceResource assessment (solar, wind, hydro)

Deepmark · DEE-C85 series

Measurement duration
Desktop study to 24 months (see variants)
Technology
Solar GHI/DNI
Data source
Satellite and reanalysis
Equipment
Class A pyranometer station
Uncertainty
P50/P90 with uncertainty budget

Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Technical, legal & financial due diligence

Financial due diligence for energy platforms, Edge 5 series

SampleServiceTechnical, legal & financial due diligence

Deepmark · DEE-1B6 series

Portfolio size
100 MW to 500 MW (see variants)
Scope
Legal
Site visit
All sites above 10 MW
Legal items
Land title, PPA, approvals
Financial items
Debt and covenant review

Lead time 3-8 weeks · Warranty Professional indemnity · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Financial due diligence for energy platforms, Duo series

SampleServiceTechnical, legal & financial due diligence

Deepmark · DEE-1B6 series

Portfolio size
25 MW to 1 GW (see variants)
Scope
Technical
Site visit
All sites above 10 MW
Legal items
Litigation and compliance check
Financial items
Revenue, receivables, tax

Lead time Kick-off in 1 week · Warranty Professional indemnity · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Testing & commissioning

Pre-commissioning tests and energisation, Max series

SampleServiceTesting & commissioning

Deepmark · DEE-8F8 series

Plant capacity
1 MW to 25 MW (see variants)
Tests covered
String IV curve, insulation, earth
Instruments
Calibrated IV tracer, megger, CRM
Calibration
NABL traceable certificates
Team
Commissioning engineer plus 2 testers

Lead time 1-2 weeks on site · Warranty Retest at no cost if failure traced to test error · MOQ 1 MW

Price on quote

invoiced by BARREL

Request quote

Power system studies (load flow, short circuit, grid code)

Dynamic stability and fault ride-through study, Ultra series

SampleServicePower system studies (load flow, short circuit, grid code)

Deepmark · DEE-5E1 series

Network scale
11 kV plant to 400 kV system (see variants)
Study type
Load flow and short circuit
Software
DIgSILENT PowerFactory
Model data
Utility network model
Deliverables
Study report with results

Lead time 2-6 weeks · Warranty Revision for utility comments · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Substation construction

Control and relay panel installation, Volt 3 series

SampleServiceSubstation construction

Deepmark · DEE-835 series

Voltage class
11 kV to 400 kV (see variants)
Type
Hybrid GIS
Scope
Erection and testing
Transformers
Up to 315 MVA
Earthing
GI flat grid with ground rods

Lead time Engineering in 4-6 weeks · Warranty Defect liability 24 months · MOQ 1 bay

Price for verified buyers

invoiced by BARREL

Request quote

Solar & wind BoP construction

Deepmark · DEE-F34 series

Project size
5 MW to 200 MW (see variants)
Scope
Civil plus electrical BoP
DC cables
6 sq mm solar cable
MV cables
33 kV XLPE Al armoured
Inverter station
Skid or containerised

Lead time Mobilisation in 14 days · Warranty Workmanship 12 months · MOQ 1 MW

Price on quote

invoiced by BARREL

Request quote

Tariff & regulatory advisory

Intervention in regulatory proceedings, Ultra series

SampleServiceTariff & regulatory advisory

Deepmark · DEE-CA3 series

Matter complexity
Advisory note to Multi-party proceeding (see variants)
Forum
APTEL
Deliverable
Opinion note
Representation
Drafting only
Data support
Cost data and tariff model

Lead time Petition 4-8 weeks · Warranty As per engagement letter · MOQ 1 case

Price for verified buyers

invoiced by BARREL

Request quote

Port & marine handling

Heavy-lift discharge at port, Edge series

SampleServicePort & marine handling

Deepmark · DEE-007 series

Cargo weight
1000 tonnes to 5000 tonnes (see variants)
Cargo type
Transformers and generators
Handling
Ro-Ro
Port coverage
East coast
Survey
Lashing and discharge supervision

Lead time Execution on vessel arrival · Warranty As per port terms · MOQ 1 lot

Price on quote

invoiced by BARREL

Request quote

Warehousing & yard management

Project warehousing near solar and wind sites, Pro 8 series

SampleServiceWarehousing & yard management

Deepmark · DEE-641 series

Storage area
500 sq m to 2500 sq m (see variants)
Storage type
Open yard
Handling equipment
Heavy cranes up to 100 tonnes
Security
24x7 guards and CCTV
Inventory system
Daily stock statement

Lead time Setup in 2 weeks · Warranty Insurance cover · MOQ 1 month

Price for verified buyers

invoiced by BARREL

Request quote

Bonded warehousing for imported equipment, Plus 3 series

SampleServiceWarehousing & yard management

Deepmark · DEE-B97 series

Storage area
500 sq m to 25000 sq m (see variants)
Storage type
Covered warehouse
Handling equipment
Forklifts and cranes
Security
Perimeter fencing, access control
Inventory system
WMS with barcode

Lead time Setup in 2 weeks · Warranty Insurance cover · MOQ 1 month

Price for verified buyers

invoiced by BARREL

Request quote

Feasibility studies & DPR

Deepmark · DEE-621 series

Project capacity
10 MW to 500 MW (see variants)
Scope
Pre-feasibility
Energy yield
PVsyst P50/P90
Financial model
Sensitivity and tariff analysis
Grid assessment
GNA/connectivity route study

Lead time 3-12 weeks · Warranty Clarification support for 6 months · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Deepmark · DEE-626 series

Project capacity
1 MW to 10 MW (see variants)
Scope
Bankable DPR
Energy yield
PVsyst P50/P90
Financial model
Sensitivity and tariff analysis
Grid assessment
GNA/connectivity route study

Lead time 3-12 weeks · Warranty As per contract · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Cabling, trenching & HDD works

Deepmark · DEE-C83 series

Cable route length
5 km to 50 km (see variants)
Method
Trench plus HDD for crossings
HDD capacity
Up to 250 mm bore
Trench depth
1.2 m
Cable type
LT armoured

Lead time Permits may extend timeline · Warranty Restoration warranty 6 months · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Project management (PMC) & owner's engineer

Construction supervision and QA/QC, Titan series

SampleServiceProject management (PMC) & owner's engineer

Deepmark · DEE-A06 series

Project size
25 MW to 500 MW (see variants)
Scope
Design review and QA/QC
Team on site
1 project manager plus 1 engineer
Schedule control
MS Project weekly
Reporting
Weekly progress report

Lead time Deployment in 2 weeks · Warranty As per contract · MOQ 1 month

Price for verified buyers

invoiced by BARREL

Request quote

ODC & heavy-haul transport

ODC transport for power transformers, Neo series

SampleServiceODC & heavy-haul transport

Deepmark · DEE-8F1 series

Consignment weight
20 tonnes to 150 tonnes (see variants)
Equipment
Modular trailer
Route survey
Optional
Escort and permits
Police and highway permits included
Insurance
Marine-cum-road transit insurance

Lead time Permits 7-21 days · Warranty Transit damage claims support · MOQ 1 job

Price for verified buyers

invoiced by BARREL

Request quote

Civil & foundation works

Deepmark · DEE-3B2 series

Works volume
5 MW equivalent to 100 MW equivalent (see variants)
Foundation type
Ramming or screw pile
Concrete grade
M30
Pull-out testing
Random test plus lateral load
Reinforcement
Fe 550D

Lead time Mobilisation in 10 days · Warranty Pile load test certified · MOQ 1 job

Price for verified buyers

invoiced by BARREL

Request quote

Freight forwarding & customs clearance

Export documentation for manufacturers, Duo series

SampleServiceFreight forwarding & customs clearance

Deepmark · DEE-515 series

Shipment size
1 CBM to Multiple containers (see variants)
Mode
Sea LCL
Customs services
Bill of entry and clearance
Incoterm
FOB
Permits
Solar and EPCG benefits

Lead time Booking in 2-3 days · Warranty As per freight terms · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Air and sea freight for power equipment, Smart series

SampleServiceFreight forwarding & customs clearance

Deepmark · DEE-AB3 series

Shipment size
5 CBM to 40 ft container (see variants)
Mode
Multimodal
Customs services
Duty planning and classification
Incoterm
DAP
Permits
Solar and EPCG benefits

Lead time Booking in 2-3 days · Warranty As per freight terms · MOQ 1 lot

Price on quote

invoiced by BARREL

Request quote

Installation & erection

Deepmark · DEE-C47 series

Installation scope
1 MW to 100 MW (see variants)
Scope
Complete mechanical and electrical erection
Manpower deployed
60 technicians plus supervisors
Supervision
Project manager, engineers, QA/QC
Equipment
Pile driver, crane, telehandler

Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW

Price for verified buyers

invoiced by BARREL

Request quote

EIA, ESG & environmental studies

Biodiversity and avifauna study, Smart series

SampleServiceEIA, ESG & environmental studies

Deepmark · DEE-441 series

Project scale
250 MW to 1 GW (see variants)
Study
ESIA to IFC standards
Baseline season
Three seasons
Deliverables
Final EIA with approvals
Lab testing
In-house lab

Lead time Kick-off in 1 week · Warranty Query response with regulators at no cost · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Procurement & sourcing services

Price benchmarking and negotiation support, Flex series

SampleServiceProcurement & sourcing services

Deepmark · DEE-283 series

Procurement value
INR 1 crore to INR 100 crore (see variants)
Scope
Full procurement cycle
Category
Electrical BoP
Vendor audit
Desktop pre-qualification
Fee model
Percentage of purchase value

Lead time RFQ cycle 2-4 weeks · Warranty As per contract · MOQ 1 lot

Price on quote

invoiced by BARREL

Request quote

Vendor audit and prequalification, Volt series

SampleServiceProcurement & sourcing services

Deepmark · DEE-132 series

Procurement value
INR 1 crore to INR 100 crore (see variants)
Scope
Vendor shortlisting
Category
Electrical BoP
Vendor audit
Factory audit
Fee model
Percentage of purchase value

Lead time RFQ cycle 2-4 weeks · Warranty Vendor performance follow-up · MOQ 1 lot

Price on quote

invoiced by BARREL

Request quote

Lender's engineer & TEV studies

Techno-economic viability study, Flex series

SampleServiceLender's engineer & TEV studies

Deepmark · DEE-9D6 series

Project cost
INR 50 crore to INR 1000 crore (see variants)
Phase
Pre-financing TEV
Scope
Contract and permit review
Reporting
TEV report
Site visits
Monthly

Lead time Appointment in 1 week · Warranty Report reliance letter to lenders · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Engineering & design

Cable and earthing design package, Duo 5 series

SampleServiceEngineering & design

Deepmark · DEE-AE7 series

Plant capacity
25 MW to 250 MW (see variants)
Deliverables
GA drawings, SLD, BoQ
Design software
PVsyst, STAAD, ETAP, Civil 3D
Team
Electrical, civil and SCADA discipline leads
Turnaround
6-8 weeks

Lead time 6-10 weeks · Warranty Design correction at no cost for 12 months · MOQ 1 job

Price for verified buyers

invoiced by BARREL

Request quote

Transmission line erection & stringing

Transmission line tower erection and stringing, Max series

SampleServiceTransmission line erection & stringing

Deepmark · DEE-5C3 series

Voltage level
220 kV to 765 kV (see variants)
Circuit type
Double circuit
Conductor
ACSR Panther
Scope
Foundation, erection and stringing
Stringing method
Tension stringing

Lead time Material availability dependent · Warranty Defect liability 24 months · MOQ 1 km

Price on quote

invoiced by BARREL

Request quote

EPC / turnkey contracting

Hybrid solar-wind EPC, Plus 5 series

SampleServiceEPC / turnkey contracting

Deepmark · DEE-B75 series

Project capacity
10 MWp to 300 MWp (see variants)
Scope
Turnkey including land liaison and approvals
Module technology
Mono PERC DCR
Inverter
Central inverter
Performance guarantee
PR 80% for first year

Lead time 3-6 months to commissioning · Warranty Inverter 5-10 years · MOQ 1 MWp

Price on quote

invoiced by BARREL

Request quote

Surveys (topo, geotech, drone)

Pile load test and resistivity survey, Max series

SampleServiceSurveys (topo, geotech, drone)

Deepmark · DEE-8D6 series

Survey area
25 acres to 1000 acres (see variants)
Survey method
Drone photogrammetry
Accuracy
Horizontal 20 mm, vertical 30 mm
Deliverables
Geotech report with bore logs
Geotech boreholes
1 per 10 acres to 15 m depth

Lead time Mobilisation in 5 days · Warranty Re-survey of disputed areas at no cost · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited