Catalogue / Resource assessment (solar, wind, hydro)
Hydro resource and flow duration study, Smart seriesSample
by Deepmark Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deepmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Deepmark Smart hydro resource and flow duration study, offered in 6 measurement duration options from Desktop study to 24 months. Key features: loss factors for local conditions, independent bankable estimate and long-term correction using reference data. Typically used for state agencies mapping resource, lenders needing P90 and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deepmark
- Model
- DEE-C85 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyDEE-C85-01 | Measurement duration: Desktop study | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration3 monthsDEE-C85-02 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration6 monthsDEE-C85-03 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration12 monthsDEE-C85-04 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration18 monthsDEE-C85-05 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration24 monthsDEE-C85-06 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | Desktop study to 24 months (see variants) |
|---|---|
| Technology | Solar GHI/DNI |
| Data source | Satellite and reanalysismade to order: On-site measurement / Hybrid with MCP |
| Equipment | Class A pyranometer station |
| Uncertainty | P50/P90 with uncertainty budget |
| Modelling | PVsyst, SAM |
| Deliverable | Resource report |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Multi-site comparisonmade to order: Single site |
| Maintenance | Remote health checks |
| Turnaround | Report in 3 weeks |