Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Hydro resource and flow duration study, Smart seriesSample

by Deepmark Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Deepmark Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Deepmark Smart hydro resource and flow duration study, offered in 6 measurement duration options from Desktop study to 24 months. Key features: loss factors for local conditions, independent bankable estimate and long-term correction using reference data. Typically used for state agencies mapping resource, lenders needing P90 and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Deepmark
Model
DEE-C85 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
South India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studyDEE-C85-01Measurement duration: Desktop study1 report · Desktop in 2-3 weekson quote
Measurement duration3 monthsDEE-C85-02Measurement duration: 3 months1 report · Desktop in 2-3 weekson quote
Measurement duration6 monthsDEE-C85-03Measurement duration: 6 months1 report · Desktop in 2-3 weekson quote
Measurement duration12 monthsDEE-C85-04Measurement duration: 12 months1 report · Desktop in 2-3 weekson quote
Measurement duration18 monthsDEE-C85-05Measurement duration: 18 months1 report · Campaign 3-24 monthson quote
Measurement duration24 monthsDEE-C85-06Measurement duration: 24 months1 report · Campaign 3-24 monthson quote

Specifications

Measurement durationDesktop study to 24 months (see variants)
TechnologySolar GHI/DNI
Data sourceSatellite and reanalysismade to order: On-site measurement / Hybrid with MCP
EquipmentClass A pyranometer station
UncertaintyP50/P90 with uncertainty budget
ModellingPVsyst, SAM
DeliverableResource report
CalibrationTraceable calibrationmade to order: Calibration pre and post campaign
Site countMulti-site comparisonmade to order: Single site
MaintenanceRemote health checks
TurnaroundReport in 3 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited