Catalogue / Civil & foundation works

No photo yet

Control room and substation building construction, Ultra seriesSample

by Deepmark Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Deepmark Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Ultra service of control room and substation building construction by Deepmark covers 5 works volume options (5 MW equivalent to 100 MW equivalent). Highlights: cube and pile test records, waterproofing for cable trenches and pile layout tolerance maintained to design. Typically used for industrial plants, substations and control rooms and solar parks. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Deepmark
Model
DEE-3B2 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume5 MW equivalentDEE-3B2-01Works volume: 5 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume10 MW equivalentDEE-3B2-02Works volume: 10 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume25 MW equivalentDEE-3B2-03Works volume: 25 MW equivalent1 job · Mobilisation in 10 daysfor verified buyers
Works volume50 MW equivalentDEE-3B2-04Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume100 MW equivalentDEE-3B2-05Works volume: 100 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume5 MW equivalent to 100 MW equivalent (see variants)
Foundation typeRamming or screw pilemade to order: Driven steel pile / RCC bored pile / Raft or isolated footing
Concrete gradeM30made to order: M25 / M40 for turbine foundation
Pull-out testingRandom test plus lateral load
ReinforcementFe 550D
Roads and drainageWBM road with culverts
BoundaryChain link fence 2.4 m
QualityNABL lab testing of materialsmade to order: Cube test reports per pour
MachineryBatching plant at sitemade to order: Piling rigs and excavators
Duration4-8 weeks
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited