Catalogue / Feasibility studies & DPR
Detailed project report for wind and hybrid plants, Plus 2 seriesSample
by Deepmark Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deepmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Detailed project report for wind and hybrid plants from Deepmark, Plus 2 series: 4 project capacity options between 10 MW and 500 MW. Design: risk register with mitigations, statutory approvals roadmap and capex and opex benchmarks for Indian market. Used by developers and IPPs, industrial captive consumers and funds and lenders. Delivered in line with MNRE Guidelines, CERC Tariff Regulations and IEC 61724-1. Mobilisation 3-12 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deepmark
- Model
- DEE-621 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 3-12 weeks
- Warranty
- Clarification support for 6 months
- Standards
- MNRE Guidelines, CERC Tariff Regulations, IEC 61724-1
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project capacity10 MWDEE-621-01 | Project capacity: 10 MW | 1 report · 3-12 weeks | on quote |
| Project capacity50 MWDEE-621-02 | Project capacity: 50 MW | 1 report · 3-12 weeks | on quote |
| Project capacity100 MWDEE-621-03 | Project capacity: 100 MW | 1 report · 3-12 weeks | on quote |
| Project capacity500 MWDEE-621-04 | Project capacity: 500 MW | 1 report · 3-12 weeks | on quote |
Specifications
| Project capacity | 10 MW to 500 MW (see variants) |
|---|---|
| Scope | Pre-feasibilitymade to order: Feasibility with financial model / Bankable DPR |
| Energy yield | PVsyst P50/P90made to order: WAsP wind energy assessment |
| Financial model | Sensitivity and tariff analysis |
| Grid assessment | GNA/connectivity route study |
| Site visit | Two visits with geotechmade to order: One visit with drone survey |
| Environmental screening | Optional add-on |
| Team | Multi-disciplinary team of 5made to order: Lead consultant and analyst |
| Turnaround | 3-4 weeks |
| Deliverable | Report, model and presentationmade to order: PDF report with Excel model |
| Review rounds | Two with client comments |