Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Hydro resource and flow duration study, Smart seriesSample

by Deepmark Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Deepmark Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Smart service of hydro resource and flow duration study by Deepmark covers 4 measurement duration options (6 months to 24 months). Highlights: loss factors for local conditions, turbine and module selection input and extreme wind and wake studies. Typically used for lenders needing P90, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Deepmark
Model
DEE-C84 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement duration6 monthsDEE-C84-01Measurement duration: 6 months1 report · Desktop in 2-3 weekson quote
Measurement duration12 monthsDEE-C84-02Measurement duration: 12 months1 report · Desktop in 2-3 weekson quote
Measurement duration18 monthsDEE-C84-03Measurement duration: 18 months1 report · Campaign 3-24 monthson quote
Measurement duration24 monthsDEE-C84-04Measurement duration: 24 months1 report · Campaign 3-24 monthson quote

Specifications

Measurement duration6 months to 24 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceOn-site measurementmade to order: Satellite and reanalysis / Hybrid with MCP
Equipment80-120 m met mast with LiDAR
UncertaintyBankable assessment
ModellingWAsP, WindPROmade to order: PVsyst, SAM
DeliverableHourly time series dataset
CalibrationCalibration pre and post campaign
Site countMulti-site comparisonmade to order: Single site
MaintenanceQuarterly site visitmade to order: Remote health checks
TurnaroundReport within 6 weeks of datamade to order: Report in 3 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited