Catalogue / Power system studies (load flow, short circuit, grid code)
Dynamic stability and fault ride-through study, Ultra seriesSample
by Deepmark Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Deepmark Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Dynamic stability and fault ride-through study from Deepmark, Ultra series: 6 network scale options between 11 kV plant and 400 kV system. Design: reactive power capability curves, PSS/E and PSCAD model support and reports for GNA/connectivity application. Suited to renewable developers seeking connectivity, industrial plants adding generation and utilities and consultants. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Deepmark
- Model
- DEE-5E1 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantDEE-5E1-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | for verified buyers |
| Network scale33 kV plantDEE-5E1-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | for verified buyers |
| Network scale66 kV systemDEE-5E1-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale132 kV systemDEE-5E1-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale220 kV systemDEE-5E1-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale400 kV systemDEE-5E1-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | for verified buyers |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Load flow and short circuit |
| Software | DIgSILENT PowerFactorymade to order: ETAP / PSS/E |
| Model data | Utility network model |
| Deliverables | Study report with results |
| Grid code checks | Voltage and reactive power capability |
| Review | Utility submission supportmade to order: Lender review |
| Scenarios | Multiple dispatch casesmade to order: Normal and N-1 |
| Team | Lead plus modelling specialistmade to order: Power system engineer |
| Turnaround | 4-6 weeks |
| Validation | Peer reviewmade to order: Compared with measured data |