Catalogue / Waste-heat recovery units
Exhaust waste-heat recovery boiler, Edge 8 seriesSample
by Gupta Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Gupta Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Edge 8 range of exhaust waste-heat recovery boiler by Gupta covers 5 recovered heat options (0.5 MWth to 10 MWth). Highlights: diverter damper for independent engine operation, low pressure drop on engine exhaust and corrosion protection for low-temperature end. Suited to gas engine plants, process heat users and cement and steel waste heat. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Gupta
- Model
- GUP-FE1 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 18-26 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthGUP-FE1-01 | Recovered heat: 0.5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat1 MWthGUP-FE1-02 | Recovered heat: 1 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat3 MWthGUP-FE1-03 | Recovered heat: 3 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthGUP-FE1-04 | Recovered heat: 5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat10 MWthGUP-FE1-05 | Recovered heat: 10 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 10 MWth (see variants) |
|---|---|
| Heat source | Gas engine exhaustmade to order: Gas turbine exhaust / Kiln gas |
| Gas inlet temperature | 650 Cmade to order: 400 C / 550 C |
| Medium | Hot watermade to order: Steam / Thermal oil / Organic fluid |
| Steam pressure | 8 bar |
| Power output (ORC) | 500 kW |
| Construction | Bare tubemade to order: Fin tube / Shell and tube |
| Material | Carbon steelmade to order: Corten / SS 304 |
| Bypass damper | Diverter included |
| Design code | ASMEmade to order: IBR |
| Gas pressure drop | < 250 mmWC |