Catalogue / Waste-heat recovery units

No photo yet

Exhaust waste-heat recovery boiler, Edge 8 seriesSample

by Gupta Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Gupta Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Edge 8 range of exhaust waste-heat recovery boiler by Gupta covers 5 recovered heat options (0.5 MWth to 10 MWth). Highlights: diverter damper for independent engine operation, low pressure drop on engine exhaust and corrosion protection for low-temperature end. Suited to gas engine plants, process heat users and cement and steel waste heat. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Gupta
Model
GUP-FE1 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
18-26 weeks
Warranty
18 months
Standards
IBR 1950, ASME Sec VIII, IS 2825
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Recovered heat0.5 MWthGUP-FE1-01Recovered heat: 0.5 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat1 MWthGUP-FE1-02Recovered heat: 1 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat3 MWthGUP-FE1-03Recovered heat: 3 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat5 MWthGUP-FE1-04Recovered heat: 5 MWth1 nos · 18-26 weeksfor verified buyers
Recovered heat10 MWthGUP-FE1-05Recovered heat: 10 MWth1 nos · 18-26 weeksfor verified buyers

Specifications

Recovered heat0.5 MWth to 10 MWth (see variants)
Heat sourceGas engine exhaustmade to order: Gas turbine exhaust / Kiln gas
Gas inlet temperature650 Cmade to order: 400 C / 550 C
MediumHot watermade to order: Steam / Thermal oil / Organic fluid
Steam pressure8 bar
Power output (ORC)500 kW
ConstructionBare tubemade to order: Fin tube / Shell and tube
MaterialCarbon steelmade to order: Corten / SS 304
Bypass damperDiverter included
Design codeASMEmade to order: IBR
Gas pressure drop< 250 mmWC

BARREL: Bharat Atom Renewable Resources Energy Limited