Catalogue / Waste-heat recovery units
Engine exhaust heat exchanger, Max seriesSample
by Gupta Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Gupta Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Gupta Max engine exhaust heat exchanger, offered in 6 recovered heat options from 0.5 MWth to 20 MWth. Highlights: increase total plant efficiency to 80 percent plus, low pressure drop on engine exhaust and diverter damper for independent engine operation. Used by CHP plants, process heat users and cement and steel waste heat. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Gupta
- Model
- GUP-604 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 18-26 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthGUP-604-01 | Recovered heat: 0.5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat1 MWthGUP-604-02 | Recovered heat: 1 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat3 MWthGUP-604-03 | Recovered heat: 3 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat5 MWthGUP-604-04 | Recovered heat: 5 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat10 MWthGUP-604-05 | Recovered heat: 10 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat20 MWthGUP-604-06 | Recovered heat: 20 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Gas engine exhaustmade to order: Gas turbine exhaust / Kiln gas |
| Gas inlet temperature | 400 Cmade to order: 550 C / 650 C |
| Medium | Hot watermade to order: Steam / Thermal oil / Organic fluid |
| Steam pressure | 17 barmade to order: 8 bar / 40 bar |
| Power output (ORC) | 100 kWmade to order: 500 kW / 2 MW |
| Construction | Shell and tube |
| Material | Carbon steel |
| Bypass damper | Diverter included |
| Design code | ASME |
| Gas pressure drop | < 250 mmWC |