Catalogue / Waste-heat recovery units

No photo yet

Waste-heat to power steam turbine set, Titan 4 seriesSample

by Gupta Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Gupta Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Gupta Titan 4 waste-heat to power steam turbine set, offered in 3 recovered heat options from 5 MWth to 20 MWth. Key features: low pressure drop on engine exhaust, corrosion protection for low-temperature end and diverter damper for independent engine operation. Used by cement and steel waste heat, gas engine plants and process heat users. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Gupta
Model
GUP-B18 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
10-14 weeks
Warranty
18 months
Standards
IBR 1950, ASME Sec VIII, IS 2825
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
Door delivery in metro cities
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Recovered heat5 MWthGUP-B18-01Recovered heat: 5 MWth1 nos · 10-14 weeksfor verified buyers
Recovered heat10 MWthGUP-B18-02Recovered heat: 10 MWth1 nos · 10-14 weeksfor verified buyers
Recovered heat20 MWthGUP-B18-03Recovered heat: 20 MWth1 nos · 10-14 weeksfor verified buyers

Specifications

Recovered heat5 MWth to 20 MWth (see variants)
Heat sourceKiln gasmade to order: Gas engine exhaust / Gas turbine exhaust
Gas inlet temperature400 Cmade to order: 550 C / 650 C
MediumThermal oilmade to order: Steam / Hot water / Organic fluid
Steam pressure17 bar
Power output (ORC)500 kW
ConstructionBare tube
MaterialCorten
Bypass damperDiverter included
Design codeIBR
Gas pressure drop< 250 mmWC

BARREL: Bharat Atom Renewable Resources Energy Limited