Catalogue / Waste-heat recovery units
Engine exhaust heat exchanger, Volt 7 seriesSample
by Indraprasthaflux Gas Turbines (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Indraprasthaflux Gas Turbines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Volt 7 range of engine exhaust heat exchanger by Indraprasthaflux covers 6 recovered heat options (0.5 MWth to 20 MWth). Key features: diverter damper for independent engine operation, increase total plant efficiency to 80 percent plus and corrosion protection for low-temperature end. Used by cement and steel waste heat, process heat users and CHP plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 10-14 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Indraprasthaflux
- Model
- IND-602 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 10-14 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthIND-602-01 | Recovered heat: 0.5 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat1 MWthIND-602-02 | Recovered heat: 1 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat3 MWthIND-602-03 | Recovered heat: 3 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat5 MWthIND-602-04 | Recovered heat: 5 MWth | 1 nos · 10-14 weeks | for verified buyers |
| Recovered heat10 MWthIND-602-05 | Recovered heat: 10 MWth | 1 nos · 18-26 weeks | for verified buyers |
| Recovered heat20 MWthIND-602-06 | Recovered heat: 20 MWth | 1 nos · 18-26 weeks | for verified buyers |
Specifications
| Recovered heat | 0.5 MWth to 20 MWth (see variants) |
|---|---|
| Heat source | Gas turbine exhaustmade to order: Gas engine exhaust / Kiln gas |
| Gas inlet temperature | 400 C |
| Medium | Thermal oilmade to order: Steam / Hot water / Organic fluid |
| Steam pressure | 17 bar |
| Power output (ORC) | 2 MWmade to order: 100 kW / 500 kW |
| Construction | Bare tubemade to order: Fin tube / Shell and tube |
| Material | Carbon steel |
| Bypass damper | Diverter included |
| Design code | IBR |
| Gas pressure drop | < 250 mmWC |