Catalogue / Waste-heat recovery units
Waste-heat to power steam turbine set, Eco seriesSample
by Indraprasthaflux Gas Turbines (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Indraprasthaflux Gas Turbines (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Eco range of waste-heat to power steam turbine set by Indraprasthaflux covers 3 recovered heat options (0.5 MWth to 3 MWth). Key features: corrosion protection for low-temperature end, increase total plant efficiency to 80 percent plus and low pressure drop on engine exhaust. Suited to process heat users, CHP plants and gas engine plants. Designed and tested to IBR 1950, ASME Sec VIII and IS 2825. Lead time 18-26 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Indraprasthaflux
- Model
- IND-B17 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 18-26 weeks
- Warranty
- 12 months
- Standards
- IBR 1950, ASME Sec VIII, IS 2825
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Recovered heat0.5 MWthIND-B17-01 | Recovered heat: 0.5 MWth | 2 nos · 18-26 weeks | on quote |
| Recovered heat1 MWthIND-B17-02 | Recovered heat: 1 MWth | 2 nos · 18-26 weeks | on quote |
| Recovered heat3 MWthIND-B17-03 | Recovered heat: 3 MWth | 2 nos · 18-26 weeks | on quote |
Specifications
| Recovered heat | 0.5 MWth to 3 MWth (see variants) |
|---|---|
| Heat source | Gas turbine exhaust |
| Gas inlet temperature | 650 C |
| Medium | Hot watermade to order: Steam / Thermal oil / Organic fluid |
| Steam pressure | 8 bar |
| Power output (ORC) | 500 kWmade to order: 100 kW / 2 MW |
| Construction | Shell and tube |
| Material | SS 304made to order: Carbon steel / Corten |
| Bypass damper | Diverter included |
| Design code | IBR |
| Gas pressure drop | < 250 mmWC |