Catalogue / Traction SCADA

No photo yet

Remote control centre for traction, Max seriesSample

by Kakatiya Rail Electrification (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiya Rail Electrification (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Max range of remote control centre for traction by Kakatiya covers 4 control posts options (Up to 10 posts to Up to 100 posts). Design: remote operation of interrupters and isolators, energy and tariff reports and impedance fault locator. Suited to industrial rail, mining railways and metro traction control. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiya
Model
KAK-EA6 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
12-16 weeks
Warranty
36 months with AMC
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
South India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsKAK-EA6-01Control posts: Up to 10 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 25 postsKAK-EA6-02Control posts: Up to 25 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 50 postsKAK-EA6-03Control posts: Up to 50 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 100 postsKAK-EA6-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 100 posts (see variants)
ArchitectureDistributed
RTU I/OPer post
CommunicationOFC / MPLSmade to order: GSM backup
ProtocolIEC 60870-5-104made to order: IEC 61850
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited