Merchants / KAKATIYARAILELECTR

Kakatiya Rail Electrification (Sample)

Kakatiya Rail Electrification Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 17 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

OHE masts, cantilevers & catenary

Portal for overhead equipment, Smart 7 series

SampleOHE masts, cantilevers & catenary

Kakatiya · KAK-F52 series

Mast type
Double track mast to Tunnel bracket (see variants)
Section
Tubular
Height
8 m
Steel grade
Fe 490
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Cantilever assembly, Duo series

SampleOHE masts, cantilevers & catenary

Kakatiya · KAK-C23 series

Mast type
Single track mast to Portal 4-track (see variants)
Section
Fabricated lattice
Height
11.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

OHE mast, Eco series

SampleOHE masts, cantilevers & catenary

Kakatiya · KAK-F84 series

Mast type
Single track mast to Booster mast (see variants)
Section
Tubular
Height
11.5 m
Steel grade
Fe 490
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty As per contract · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Catenary bracket set, Elite series

SampleOHE masts, cantilevers & catenary

Kakatiya · KAK-681 series

Mast type
Double track mast to Booster mast (see variants)
Section
Rolled beam
Height
11.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty As per contract · MOQ 2 nos

Price on quote

invoiced by BARREL

Request quote

Traction SCADA

Kakatiya · KAK-D73 series

Control posts
Up to 10 posts to Up to 100 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 60870-5-104

Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Kakatiya · KAK-EA6 series

Control posts
Up to 10 posts to Up to 100 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 60870-5-104

Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Kakatiya · KAK-275 series

Control posts
Up to 10 posts to Up to 50 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 60870-5-104

Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Traction substations & transformers

Traction power transformer 25 kV single-phase, Titan 9 series

SampleTraction substations & transformers

Kakatiya · KAK-567 series

Rating
20 MVA to 30 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
2 x 27.5 kV
Connection
Scott
Cooling
ONAN/ONAF

Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Scott-connected traction transformer, Smart series

SampleTraction substations & transformers

Kakatiya · KAK-D44 series

Rating
20 MVA to 50 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
55 kV (2x25)
Connection
Single-phase
Cooling
ONAN

Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Booster transformer, Neo series

SampleTraction substations & transformers

Kakatiya · KAK-068 series

Rating
20 MVA to 50 MVA (see variants)
Primary voltage
220 kV
Secondary voltage
27.5 kV
Connection
Auto-transformer
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Section insulators & neutral sections

Neutral section with SCADA indication, Plus series

SampleSection insulators & neutral sections

Kakatiya · KAK-2A4 series

Type
Neutral section to Auto-passing neutral (see variants)
Voltage
2 x 25 kV AC
Material
Polymer
Length
18 m
Rated current
400 A

Lead time 8-10 weeks · Warranty 24 months · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Sectioning insulator assembly, Plus series

SampleSection insulators & neutral sections

Kakatiya · KAK-FF4 series

Type
Standard section insulator to Insulated overlap (see variants)
Voltage
2 x 25 kV AC
Material
Polymer
Length
15 m
Rated current
400 A

Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Neutral section (phase break), Duo 5 series

SampleSection insulators & neutral sections

Kakatiya · KAK-C95 series

Type
Neutral section to Neutral section 2 x 25 kV (see variants)
Voltage
2 x 25 kV AC
Material
Epoxy glass
Length
18 m
Rated current
600 A

Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Contact & messenger wires

Cadmium copper messenger wire, Pro series

SampleContact & messenger wires

Kakatiya · KAK-012 series

Conductor
107 mm2 contact wire to Droppers (see variants)
Material
Copper magnesium
Section
Grooved
Tensile strength
≥ 480 N/mm2
Conductivity
≥ 97% IACS

Lead time 8-10 weeks · Warranty 12 months · MOQ 1 km

Price on quote

invoiced by BARREL

Request quote

Bronze catenary wire, Eco series

SampleContact & messenger wires

Kakatiya · KAK-006 series

Conductor
107 mm2 contact wire to Droppers (see variants)
Material
Copper silver
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 80% IACS

Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km

Price for verified buyers

invoiced by BARREL

Request quote

Grooved copper contact wire, Flex series

SampleContact & messenger wires

Kakatiya · KAK-7B7 series

Conductor
107 mm2 contact wire to Droppers (see variants)
Material
Cadmium copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 80% IACS

Lead time 4-6 weeks · Warranty As per contract · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Silver copper contact wire, Titan series

SampleContact & messenger wires

Kakatiya · KAK-0F2 series

Conductor
107 mm2 contact wire to Droppers (see variants)
Material
Hard drawn copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 97% IACS

Lead time 4-6 weeks · Warranty 12 months · MOQ 5 km

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited