Catalogue / Electrical safety audits

No photo yet

Electrical safety audit of industrial plants, Plus 7 seriesSample

by Kakatiyarajat Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kakatiyarajat Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Kakatiyarajat Plus 7 electrical safety audit of industrial plants, offered in 3 installed load options from 10 MVA to 50 MVA. Key features: compliance matrix against CEA safety rules, risk-ranked findings and training recommendations for staff. Suited to hospitals and commercial buildings, data centres and manufacturing plants. Delivered in line with Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations and IS 5216. Mobilisation Audit in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kakatiyarajat
Model
KAK-685 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications on report at no cost for 6 months
Standards
Indian Electricity Act 2003, CEA (Measures relating to Safety) Regulations, IS 5216
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installed load10 MVAKAK-685-01Installed load: 10 MVA1 site · Audit in 1-2 weekson quote
Installed load25 MVAKAK-685-02Installed load: 25 MVA1 site · Audit in 1-2 weekson quote
Installed load50 MVAKAK-685-03Installed load: 50 MVA1 site · Audit in 1-2 weekson quote

Specifications

Installed load10 MVA to 50 MVA (see variants)
ScopeVisual and documentation auditmade to order: Audit with measurements / Audit with arc-flash study
AuditorChartered engineer
MeasurementsThermography and power qualitymade to order: Earth resistance, insulation
ReportFindings with risk ratingmade to order: Action plan with timeline
Statutory recordsPermit-to-work audit
SamplingRepresentative LV panelsmade to order: 100% of HV equipment
Follow-upClose-out verificationmade to order: Re-audit after 3 months
Turnaround1-2 weeks
PresentationReport onlymade to order: Findings to management
AccreditationGovernment recognised agency

BARREL: Bharat Atom Renewable Resources Energy Limited