Merchants / KAKATIYARAJATCONSU

Kakatiyarajat Consultants (Sample)

Kakatiyarajat Consultants Engineers Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 17 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Site acceptance & pre-commissioning tests

Earth resistance and step-touch potential tests, Ultra 6 series

SampleServiceSite acceptance & pre-commissioning tests

Kakatiyarajat · KAK-C98 series

Plant size
1 MW to 100 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Relay test set, IV tracer, CRM
Test sequence
Per client approved format
Team
Test engineer plus 2 technicians

Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Earth resistance and step-touch potential tests, Pro 5 series

SampleServiceSite acceptance & pre-commissioning tests

Kakatiyarajat · KAK-C98 series

Plant size
1 MW to 100 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Insulation tester, earth tester
Test sequence
Per client approved format
Team
Team of 6 with lead

Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Skilled technicians & electricians

Skilled electricians for site works, Volt series

SampleServiceSkilled technicians & electricians

Kakatiyarajat · KAK-004 series

Team size
5 persons to 100 persons (see variants)
Trade
Lineman
Qualification
Diploma
Experience
2-5 years
Compliance
Contract labour licence

Lead time Deployment in 7-14 days · Warranty Replacement at no cost for unsuitable workers · MOQ 1 man-month

Price on quote

invoiced by BARREL

Request quote

Electrical safety audits

Kakatiyarajat · KAK-685 series

Installed load
10 MVA to 50 MVA (see variants)
Scope
Visual and documentation audit
Auditor
Chartered engineer
Measurements
Thermography and power quality
Report
Findings with risk rating

Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price on quote

invoiced by BARREL

Request quote

Kakatiyarajat · KAK-683 series

Installed load
5 MVA to 50 MVA (see variants)
Scope
Visual and documentation audit
Auditor
Chartered engineer
Measurements
Earth resistance, insulation
Report
Findings with risk rating

Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Third-party inspection (TPI)

Kakatiyarajat · KAK-6E1 series

Inspection effort
1 man-day to 50 man-days (see variants)
Equipment inspected
Towers and structures
Inspection stage
Raw material
Standards used
Per client specification
Inspector qualification
Level II NDT certified

Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

Kakatiyarajat · KAK-6E4 series

Inspection effort
5 man-days to 50 man-days (see variants)
Equipment inspected
Cables and conductors
Inspection stage
Raw material
Standards used
Per approved QAP
Inspector qualification
Level II NDT certified

Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day

Price for verified buyers

invoiced by BARREL

Request quote

Recruitment services

Bulk hiring of site workforce, Max series

SampleServiceRecruitment services

Kakatiyarajat · KAK-0E7 series

Role seniority
Manager to General manager (see variants)
Fee basis
Percentage of annual CTC
Search
Targeted headhunting
Screening
Assessment centre
Verification
Criminal and credit check

Lead time Closure in 30-60 days · Warranty Replacement within 3 months · MOQ 1 case

Price on quote

invoiced by BARREL

Request quote

Simulators & e-learning

Virtual reality safety training, Max series

SampleServiceSimulators & e-learning

Kakatiyarajat · KAK-7E1 series

Licensed users
10 users to 250 users (see variants)
Product type
Web LMS
Content
Substation switching and faults
Languages
Regional languages
Assessment
Quizzes and scored simulations

Lead time Custom content 8-12 weeks · Warranty Software updates for licence term · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Factory acceptance test (FAT) witnessing

FAT witnessing for power transformers, Elite series

SampleServiceFactory acceptance test (FAT) witnessing

Kakatiyarajat · KAK-D82 series

Equipment value
INR 50 lakh to INR 10 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine plus special tests
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day

Price on quote

invoiced by BARREL

Request quote

Training & certification (electrical licence, work at height)

HV switching and substation operation course, Core series

SampleServiceTraining & certification (electrical licence, work at height)

Kakatiyarajat · KAK-ED2 series

Course duration
1 day to 30 days (see variants)
Programme
Electrical safety
Mode
Hybrid
Batch size
12 participants
Certification
Training completion certificate

Lead time Next batch in 2-4 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Safety officers & supervisors

Safety officers for construction sites, Neo 8 series

SampleServiceSafety officers & supervisors

Kakatiyarajat · KAK-7C9 series

Safety team
1 officer to 30 officers (see variants)
Qualification
B.E. plus PDIS
Experience
3-5 years
Certifications
NEBOSH IGC
Role
Site safety officer

Lead time Mass 3 weeks · Warranty Replacement for non-performing officer · MOQ 1 man-month

Price on quote

invoiced by BARREL

Request quote

Product certification (BIS, IEC, ALMM)

IEC certification support for power equipment, Prime series

SampleServiceProduct certification (BIS, IEC, ALMM)

Kakatiyarajat · KAK-B85 series

Certification scope
Single product BIS to ALMM List-II (cells) (see variants)
Standards covered
IS 14286 and IS 16077
Application support
Documentation and filing
Test lab liaison
Notified bodies
Factory audit
BIS inspection support

Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price for verified buyers

invoiced by BARREL

Request quote

IEC certification support for power equipment, Prime series

SampleServiceProduct certification (BIS, IEC, ALMM)

Kakatiyarajat · KAK-B86 series

Certification scope
ALMM List-I to Full global set (see variants)
Standards covered
IEC 62109 for inverters
Application support
Documentation and filing
Test lab liaison
NABL accredited labs
Factory audit
BIS inspection support

Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price for verified buyers

invoiced by BARREL

Request quote

Type & routine testing laboratories (NABL)

Type testing of transformers and switchgear, Prime 2 series

SampleServiceType & routine testing laboratories (NABL)

Kakatiyarajat · KAK-925 series

Test class
Acceptance test to Short-circuit test (see variants)
Equipment under test
Insulators
Accreditation
NABL plus BIS recognition
Rating range
Up to 33 kV
Test standard
IS or IEC as specified

Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Type testing of transformers and switchgear, Smart series

SampleServiceType & routine testing laboratories (NABL)

Kakatiyarajat · KAK-925 series

Test class
Special test to Type test (HV) (see variants)
Equipment under test
PV modules
Accreditation
NABL plus BIS recognition
Rating range
Up to 145 kV
Test standard
IS or IEC as specified

Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Contract engineers

QA/QC and commissioning engineers, Duo series

SampleServiceContract engineers

Kakatiyarajat · KAK-824 series

Engineers deployed
3 engineers to 50 engineers (see variants)
Discipline
SCADA
Experience
5-10 years
Qualification
B.E./B.Tech
Engagement
Offsite design hub

Lead time Joining in 2-4 weeks · Warranty Replacement within 30 days if unsuitable · MOQ 1 man-month

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited