Catalogue / Third-party inspection (TPI)
Third-party inspection of electrical equipment at vendor works, Core 7 seriesSample
by Kakatiyarajat Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kakatiyarajat Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Core 7 service of third-party inspection of electrical equipment at vendor works by Kakatiyarajat covers 5 inspection effort options (1 man-day to 50 man-days). Highlights: photographic evidence of each inspection, calibration check of test equipment and quick mobilisation across India. Typically used for utilities and PSUs, EPC contractors and developers and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Report in 24-48 hours; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kakatiyarajat
- Model
- KAK-6E1 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Report in 24-48 hours
- Warranty
- Re-inspection at no cost for disputed lots
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayKAK-6E1-01 | Inspection effort: 1 man-day | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort5 man-daysKAK-6E1-02 | Inspection effort: 5 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort10 man-daysKAK-6E1-03 | Inspection effort: 10 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort20 man-daysKAK-6E1-04 | Inspection effort: 20 man-days | 1 day · Report in 24-48 hours | for verified buyers |
| Inspection effort50 man-daysKAK-6E1-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | for verified buyers |
Specifications
| Inspection effort | 1 man-day to 50 man-days (see variants) |
|---|---|
| Equipment inspected | Towers and structuresmade to order: Transformers and reactors / Switchgear and relays / PV modules and inverters |
| Inspection stage | Raw materialmade to order: In-process / Final pre-dispatch |
| Standards used | Per client specificationmade to order: Per approved QAP |
| Inspector qualification | Level II NDT certified |
| Accreditation | Empanelled inspection agency |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Pan India |
| Sampling | As per IS 2500made to order: AQL level II |
| Release note | Hard copy plus scan |
| Travel | Included in ratemade to order: At actuals |