Catalogue / Testing & commissioning
SCADA integration and communication testing, Smart 4 seriesSample
by Kalingaamrit Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalingaamrit Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Kalingaamrit Smart 4 SCADA integration and communication testing, offered in 6 plant capacity options from 5 MW to 250 MW. Highlights: test formats agreed before mobilisation, punch list tracked to closure and thermography of terminations before charging. Typically used for lender completion tests, repowering projects and DISCOM and STU charging. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalingaamrit
- Model
- KAL-EE9 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 5 days
- Warranty
- As per contract
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWKAL-EE9-01 | Plant capacity: 5 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity10 MWKAL-EE9-02 | Plant capacity: 10 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity25 MWKAL-EE9-03 | Plant capacity: 25 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity50 MWKAL-EE9-04 | Plant capacity: 50 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity100 MWKAL-EE9-05 | Plant capacity: 100 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity250 MWKAL-EE9-06 | Plant capacity: 250 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 5 MW to 250 MW (see variants) |
|---|---|
| Tests covered | Full plant functional and PR test |
| Instruments | Calibrated IV tracer, megger, CRMmade to order: Relay test set, thermal camera |
| Calibration | NABL traceable certificates |
| Team | Lead plus 5 member crew |
| Statutory support | CEIG inspection coordination |
| Reports | Test reports with signed formatsmade to order: Commissioning dossier with as-built |
| Duration on site | 10-14 daysmade to order: 5-7 days / 3-4 weeks |
| Performance guarantee test | 72-hour trial run |
| Grid code checks | Not includedmade to order: Reactive power and ramp rate |
| Payment | 50% on start, 50% on report |