Merchants / KALINGAAMRITINFRAS

Kalingaamrit Infra Services (Sample)

Kalingaamrit Infra Services Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 10 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Testing & commissioning

Kalingaamrit · KAL-EE9 series

Plant capacity
5 MW to 250 MW (see variants)
Tests covered
Full plant functional and PR test
Instruments
Calibrated IV tracer, megger, CRM
Calibration
NABL traceable certificates
Team
Lead plus 5 member crew

Lead time Mobilisation in 5 days · Warranty As per contract · MOQ 1 MW

Price on quote

invoiced by BARREL

Request quote

Civil & foundation works

Kalingaamrit · KAL-3B2 series

Works volume
5 MW equivalent to 50 MW equivalent (see variants)
Foundation type
Driven steel pile
Concrete grade
M40 for turbine foundation
Pull-out testing
2% piles tested
Reinforcement
Fe 500D TMT

Lead time Mobilisation in 10 days · Warranty Structural defect liability 24 months · MOQ 1 job

Price on quote

invoiced by BARREL

Request quote

Project management (PMC) & owner's engineer

Owner's engineer for EPC supervision, Volt 9 series

SampleServiceProject management (PMC) & owner's engineer

Kalingaamrit · KAL-C02 series

Project size
10 MW to 100 MW (see variants)
Scope
Design review and QA/QC
Team on site
1 project manager plus 1 engineer
Schedule control
Primavera P6 baseline and updates
Reporting
Monthly dashboard for lenders

Lead time Engagement for 6-24 months · Warranty Professional indemnity cover · MOQ 1 month

Price on quote

invoiced by BARREL

Request quote

Installation & erection

Kalingaamrit · KAL-DB2 series

Installation scope
5 MW to 25 MW (see variants)
Scope
Electrical BoP erection
Manpower deployed
25 technicians per MW-block
Supervision
Project manager, engineers, QA/QC
Equipment
Pile driver, crane, telehandler

Lead time Start after material at site · Warranty Workmanship 12 months · MOQ 1 MW

Price on quote

invoiced by BARREL

Request quote

Engineering & design

Kalingaamrit · KAL-009 series

Plant capacity
50 MW to 250 MW (see variants)
Deliverables
Full IFC drawing set with calculations
Design software
PVsyst, AutoCAD, ETAP
Team
Electrical, civil and SCADA discipline leads
Turnaround
3-4 weeks

Lead time 3-4 weeks · Warranty Design correction at no cost for 12 months · MOQ 1 job

Price for verified buyers

invoiced by BARREL

Request quote

Solar & wind BoP construction

Internal 33 kV cable network, Eco series

SampleServiceSolar & wind BoP construction

Kalingaamrit · KAL-A57 series

Project size
5 MW to 200 MW (see variants)
Scope
Cabling and earthing
DC cables
6 sq mm solar cable
MV cables
33 kV XLPE Al armoured
Inverter station
Brick built room

Lead time Mobilisation in 14 days · Warranty Defect liability 24 months · MOQ 1 MW

Price for verified buyers

invoiced by BARREL

Request quote

Transmission line erection & stringing

OPGW stringing and splicing, Max 9 series

SampleServiceTransmission line erection & stringing

Kalingaamrit · KAL-E19 series

Voltage level
11 kV to 220 kV (see variants)
Circuit type
Double circuit
Conductor
AAAC or HTLS
Scope
Foundation, erection and stringing
Stringing method
Tension stringing

Lead time Per section schedule · Warranty Workmanship 12 months · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Cabling, trenching & HDD works

Underground cable route survey, Core series

SampleServiceCabling, trenching & HDD works

Kalingaamrit · KAL-3B8 series

Cable route length
1 km to 50 km (see variants)
Method
Open trench
HDD capacity
Up to 250 mm bore
Trench depth
1.5 m
Cable type
LT armoured

Lead time Permits may extend timeline · Warranty Restoration warranty 6 months · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Substation construction

Switchyard erection and bus bar works, Prime 2 series

SampleServiceSubstation construction

Kalingaamrit · KAL-093 series

Voltage class
33 kV to 400 kV (see variants)
Type
Outdoor AIS
Scope
Civil and structural
Transformers
Up to 315 MVA
Earthing
GI flat grid with ground rods

Lead time Engineering in 4-6 weeks · Warranty Defect liability 24 months · MOQ 1 bay

Price on quote

invoiced by BARREL

Request quote

Surveys (topo, geotech, drone)

Pile load test and resistivity survey, Volt series

SampleServiceSurveys (topo, geotech, drone)

Kalingaamrit · KAL-8D6 series

Survey area
50 acres to 1000 acres (see variants)
Survey method
Combined drone and ground control
Accuracy
Horizontal 20 mm, vertical 30 mm
Deliverables
Contour map, DEM, CAD plan
Geotech boreholes
1 per 5 acres to 10 m depth

Lead time Report within 3 weeks of fieldwork · Warranty Re-survey of disputed areas at no cost · MOQ 1 site

Price on quote

invoiced by BARREL

Request quote