Catalogue / Cabling, trenching & HDD works
Underground cable route survey, Core seriesSample
by Kalingaamrit Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalingaamrit Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Underground cable route survey from Kalingaamrit, Core series: 6 cable route length options between 1 km and 50 km. Design: dewatering in high water table, warning tape and marker installation and utility locating before excavation. Used by urban distribution upgrades, railway and highway crossings and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalingaamrit
- Model
- KAL-3B8 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmKAL-3B8-01 | Cable route length: 1 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length2 kmKAL-3B8-02 | Cable route length: 2 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length5 kmKAL-3B8-03 | Cable route length: 5 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length10 kmKAL-3B8-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length20 kmKAL-3B8-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length50 kmKAL-3B8-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Open trench |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 1.5 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Road and footpath restorationmade to order: Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 300 m per day open trenchmade to order: 50 m per day HDD |
| Crew | HDD crew of 8 with rig |