Control room and substation building construction, Prime 6 seriesSample
by Kalingaamrit Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalingaamrit Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Control room and substation building construction from Kalingaamrit, Prime 6 series: 4 works volume options between 5 MW equivalent and 50 MW equivalent. Design: cube and pile test records, daily quantity and progress log and monsoon-ready drainage planning. Suited to solar parks, substations and control rooms and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalingaamrit
- Model
- KAL-3B2 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume5 MW equivalentKAL-3B2-01 | Works volume: 5 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume10 MW equivalentKAL-3B2-02 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentKAL-3B2-03 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume50 MW equivalentKAL-3B2-04 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 5 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | Driven steel pile |
| Concrete grade | M40 for turbine foundationmade to order: M25 / M30 |
| Pull-out testing | 2% piles testedmade to order: Random test plus lateral load |
| Reinforcement | Fe 500D TMTmade to order: Fe 550D |
| Roads and drainage | Murram road, 4 m wide |
| Boundary | Chain link fence 2.4 mmade to order: Compound wall with barbed wire |
| Quality | Cube test reports per pour |
| Machinery | Batching plant at sitemade to order: Piling rigs and excavators |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Item rate with retentionmade to order: Measured running bills |