Catalogue / Project management (PMC) & owner's engineer
Owner's engineer for EPC supervision, Volt 9 seriesSample
by Kalingaamrit Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalingaamrit Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Owner's engineer for EPC supervision from Kalingaamrit, Volt 9 series: 4 project size options between 10 MW and 100 MW. Key features: hand-holding to commissioning, safety compliance audits and independent view on contractor claims. Used by developers without in-house engineering, PSU and government implementing agencies and lender-monitored projects. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IS 14489 (Safety Audit) and FIDIC conditions of contract. Mobilisation Engagement for 6-24 months; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalingaamrit
- Model
- KAL-C02 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Engagement for 6-24 months
- Warranty
- Professional indemnity cover
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IS 14489 (Safety Audit), FIDIC conditions of contract
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size10 MWKAL-C02-01 | Project size: 10 MW | 1 month · Engagement for 6-24 months | on quote |
| Project size25 MWKAL-C02-02 | Project size: 25 MW | 1 month · Engagement for 6-24 months | on quote |
| Project size50 MWKAL-C02-03 | Project size: 50 MW | 1 month · Engagement for 6-24 months | on quote |
| Project size100 MWKAL-C02-04 | Project size: 100 MW | 1 month · Engagement for 6-24 months | on quote |
Specifications
| Project size | 10 MW to 100 MW (see variants) |
|---|---|
| Scope | Design review and QA/QCmade to order: Full PMC with contract management / Owner's engineer through COD |
| Team on site | 1 project manager plus 1 engineer |
| Schedule control | Primavera P6 baseline and updatesmade to order: MS Project weekly |
| Reporting | Monthly dashboard for lendersmade to order: Weekly progress report |
| Inspection | Material inspection at vendor works |
| Billing verification | Quantity and rate auditmade to order: Certificate for each running bill |
| Claims support | EOT and variation assessmentmade to order: Not included |
| Duration | 6 months |
| Interface management | Between EPC, DISCOM and STUmade to order: With lender engineer |
| Handover | Closure report, punch list, as-builts |