Merchants / KALINGASARVAMPOWER

Kalingasarvam Power Quality (Sample)

Kalingasarvam Power Quality Engineers Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 15 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Medium-voltage drives

Kalingasarvam · KAL-ED5 series

Rating
200 kW to 5000 kW (see variants)
Output voltage
3.3 kV
Topology
Cascaded H-bridge
Input harmonics
Below IEEE 519 (18/24/36-pulse)
Power factor
> 0.95 at full speed range

Lead time 14-18 weeks · Warranty 36 months from supply · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Voltage stabilisers

Kalingasarvam · KAL-874 series

Rating
25 kVA to 1000 kVA (see variants)
Input range
300-460 V
Output voltage
415 V ±3%
Phases
1-ph
Correction speed
25 V/s

Lead time 3-5 weeks · Warranty 12 months from supply · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Capacitor banks & APFC

Kalingasarvam · KAL-976 series

Rating
100 kVAr to 300 kVAr (see variants)
Rated voltage
415 V
Capacitor type
Gas-filled cylindrical
Switching
Contactor
Detuning
None

Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 2 nos

Price for verified buyers

invoiced by BARREL

Request quote

Kalingasarvam · KAL-AF9 series

Rating
100 kVAr to 400 kVAr (see variants)
Rated voltage
525 V
Capacitor type
Heavy-duty MPP
Switching
Thyristor
Detuning
14% (134 Hz)

Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

STATCOM & SVG

Kalingasarvam · KAL-243 series

Rating
200 kVAr to 3 MVAr (see variants)
Voltage
690 V
Topology
3-level IGBT
Response time
< 5 ms
Compensation
Capacitive and inductive, bidirectional

Lead time 8-12 weeks · Warranty 24 months from commissioning · MOQ 2 nos

Price for verified buyers

invoiced by BARREL

Request quote

Kalingasarvam · KAL-594 series

Rating
200 kVAr to 3 MVAr (see variants)
Voltage
33 kV
Topology
Cascaded H-bridge (MV)
Response time
< 10 ms
Compensation
Capacitive and inductive, bidirectional

Lead time 8-12 weeks · Warranty 36 months with AMC · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Static VAR compensators (SVC)

MV SVC with harmonic filter branches, Core 2 series

SampleStatic VAR compensators (SVC)

Kalingasarvam · KAL-FE8 series

Rating
5 MVAr to 80 MVAr (see variants)
System voltage
132 kV
Configuration
TSC only
Thyristor valve
Air-cooled
Response time
< 20 ms

Lead time 30-40 weeks · Warranty 24 months from commissioning · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Active harmonic filters

Active harmonic filter 4-wire, Duo 8 series

SampleActive harmonic filters

Kalingasarvam · KAL-F53 series

Compensation current
75 A to 150 A (see variants)
Voltage
3-ph 480 V
Wires
4-wire
Harmonic order
2nd to 25th
Response time
< 20 ms

Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Wall-mount AHF, Neo series

SampleActive harmonic filters

Kalingasarvam · KAL-A87 series

Compensation current
150 A to 300 A (see variants)
Voltage
3-ph 415 V
Wires
4-wire
Harmonic order
2nd to 25th
Response time
< 100 µs sampling

Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

VFDs & soft starters

Kalingasarvam · KAL-268 series

Rating
37 kW to 132 kW (see variants)
Input voltage
3-ph 415 V ±10%
Control mode
V/f
Overload
110% 60 s (variable torque)
Protection class
IP20

Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 5 nos

Price on quote

invoiced by BARREL

Request quote

Kalingasarvam · KAL-A57 series

Rating
75 kW to 400 kW (see variants)
Input voltage
3-ph 690 V
Control mode
Closed loop vector
Overload
110% 60 s (variable torque)
Protection class
IP54

Lead time 3-5 weeks · Warranty 18 months from commissioning · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Detuned & series reactors

Kalingasarvam · KAL-7D1 series

Rating
25 kVAr to 100 kVAr (see variants)
Detuning factor
14% (134 Hz)
Rated voltage
415 V
Core
Air core
Winding
Copper

Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 5 nos

Price on quote

invoiced by BARREL

Request quote

Servo stabilisers & isolation transformers

Servo stabiliser with built-in isolation transformer, Ultra 6 series

SampleServo stabilisers & isolation transformers

Kalingasarvam · KAL-6C7 series

Rating
10 kVA to 100 kVA (see variants)
Primary voltage
230 V
Secondary voltage
415 V
Phases
1-ph
Winding
Aluminium

Lead time 4-6 weeks · Warranty 24 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Shielded isolation transformer, Flex series

SampleServo stabilisers & isolation transformers

Kalingasarvam · KAL-478 series

Rating
25 kVA to 100 kVA (see variants)
Primary voltage
415 V
Secondary voltage
415 V
Phases
1-ph
Winding
Aluminium

Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Harmonic filters

Kalingasarvam · KAL-587 series

Filter rating
25 kVAr to 300 kVAr (see variants)
Tuned to
5th
Voltage
690 V
Reactor core
Air core (HV)
Reactor insulation
Class H

Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 2 nos

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited