Catalogue / OHE masts, cantilevers & catenary
Portal for overhead equipment, Duo 8 seriesSample
by Kalinga Traction Power (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalinga Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Kalinga Duo 8 portal for overhead equipment, offered in 4 mast type options from Double track mast to Tunnel bracket. Key features: matching cantilever sets, designed per RDSO drawings and fit-up tested before dispatch. Typically used for port railways, metro depots and industrial railway sidings. Designed and tested to RDSO TI/SPC/OHE, IS 800 and IS 2062. Lead time 8-12 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalinga
- Model
- KAL-F56 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 8-12 weeks
- Warranty
- As per contract
- Standards
- RDSO TI/SPC/OHE, IS 800, IS 2062
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Mast typeDouble track mastKAL-F56-01 | Mast type: Double track mast | 1 nos · 8-12 weeks | on quote |
| Mast typePortal 2-trackKAL-F56-02 | Mast type: Portal 2-track | 1 nos · 8-12 weeks | on quote |
| Mast typePortal 4-trackKAL-F56-03 | Mast type: Portal 4-track | 1 nos · 8-12 weeks | on quote |
| Mast typeTunnel bracketKAL-F56-04 | Mast type: Tunnel bracket | 1 nos · 8-12 weeks | on quote |
Specifications
| Mast type | Double track mast to Tunnel bracket (see variants) |
|---|---|
| Section | Rolled beam |
| Height | 11.5 m |
| Steel grade | Fe 410made to order: Fe 490 |
| Galvanising | Hot-dip 610 g/m2 |
| Mast bending moment | Per RDSO |
| Foundation | Pile |
| Cantilever | Tubular, galvanised |
| Registration arm | Included |
| Insulator | Polymer or porcelain |
| Setting distance | 2.8 mmade to order: 3.5 m |
| Fittings | Hot-dip galvanised |
| Welding | Certified welders |