Merchants / KALINGATRACTIONPOW

Kalinga Traction Power (Sample)

Kalinga Traction Power Engineers Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 17 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Traction substations & transformers

V-connected traction transformer, Volt series

SampleTraction substations & transformers

Kalinga · KAL-917 series

Rating
20 MVA to 50 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
2 x 27.5 kV
Connection
Auto-transformer
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 5 nos

Price on quote

invoiced by BARREL

Request quote

Scott-connected traction transformer, Pro 5 series

SampleTraction substations & transformers

Kalinga · KAL-D45 series

Rating
16 MVA to 50 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
27.5 kV
Connection
V-V
Cooling
ONAN

Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos

Price on quote

invoiced by BARREL

Request quote

Booster transformer, Titan 8 series

SampleTraction substations & transformers

Kalinga · KAL-067 series

Rating
10 MVA to 30 MVA (see variants)
Primary voltage
132 kV
Secondary voltage
27.5 kV
Connection
Auto-transformer
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Traction substation with circuit breakers, Flex series

SampleTraction substations & transformers

Kalinga · KAL-DE5 series

Rating
10 MVA to 30 MVA (see variants)
Primary voltage
110 kV
Secondary voltage
2 x 27.5 kV
Connection
Scott
Cooling
ONAN/ONAF

Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Traction SCADA

Kalinga · KAL-279 series

Control posts
Up to 10 posts to Up to 50 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 60870-5-104

Lead time 20-28 weeks · Warranty 24 months · MOQ 10 lot

Price on quote

invoiced by BARREL

Request quote

Kalinga · KAL-6A2 series

Control posts
Up to 10 posts to Up to 250 posts (see variants)
Architecture
Redundant server
RTU I/O
Per post
Communication
GSM backup
Protocol
IEC 61850

Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 10 lot

Price for verified buyers

invoiced by BARREL

Request quote

Kalinga · KAL-EA3 series

Control posts
Up to 25 posts to Up to 250 posts (see variants)
Architecture
Distributed
RTU I/O
Per post
Communication
OFC / MPLS
Protocol
IEC 61850

Lead time 20-28 weeks · Warranty 24 months · MOQ 1 lot

Price for verified buyers

invoiced by BARREL

Request quote

Section insulators & neutral sections

Section insulator with arc horns, Eco series

SampleSection insulators & neutral sections

Kalinga · KAL-FD1 series

Type
Neutral section to Neutral section 2 x 25 kV (see variants)
Voltage
2 x 25 kV AC
Material
Polymer
Length
20 m
Rated current
400 A

Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos

Price on quote

invoiced by BARREL

Request quote

Neutral section with SCADA indication, Titan series

SampleSection insulators & neutral sections

Kalinga · KAL-2A5 series

Type
Standard section insulator to Auto-passing neutral (see variants)
Voltage
25 kV AC
Material
Polymer
Length
15 m
Rated current
600 A

Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos

Price for verified buyers

invoiced by BARREL

Request quote

Sectioning insulator assembly, Prime 7 series

SampleSection insulators & neutral sections

Kalinga · KAL-FF2 series

Type
Neutral section to Neutral section 2 x 25 kV (see variants)
Voltage
2 x 25 kV AC
Material
Epoxy glass
Length
20 m
Rated current
400 A

Lead time 4-6 weeks · Warranty 24 months · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Contact & messenger wires

Silver copper contact wire, Prime series

SampleContact & messenger wires

Kalinga · KAL-0F5 series

Conductor
150 mm2 contact wire to 95 mm2 messenger (see variants)
Material
Cadmium copper
Section
Grooved
Tensile strength
≥ 480 N/mm2
Conductivity
≥ 97% IACS

Lead time 4-6 weeks · Warranty As per contract · MOQ 10 km

Price for verified buyers

invoiced by BARREL

Request quote

Copper magnesium contact wire, Ultra series

SampleContact & messenger wires

Kalinga · KAL-C89 series

Conductor
107 mm2 contact wire to Droppers (see variants)
Material
Cadmium copper
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 80% IACS

Lead time 4-6 weeks · Warranty As per contract · MOQ 10 km

Price for verified buyers

invoiced by BARREL

Request quote

Bronze catenary wire, Xtra series

SampleContact & messenger wires

Kalinga · KAL-003 series

Conductor
107 mm2 contact wire to Droppers (see variants)
Material
Copper silver
Section
Grooved
Tensile strength
≥ 345 N/mm2
Conductivity
≥ 97% IACS

Lead time 4-6 weeks · Warranty 12 months · MOQ 5 km

Price for verified buyers

invoiced by BARREL

Request quote

OHE masts, cantilevers & catenary

OHE mast, Pro 2 series

SampleOHE masts, cantilevers & catenary

Kalinga · KAL-F85 series

Mast type
Double track mast to Portal 4-track (see variants)
Section
Rolled beam
Height
11.5 m
Steel grade
Fe 490
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty As per contract · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Portal for overhead equipment, Duo 8 series

SampleOHE masts, cantilevers & catenary

Kalinga · KAL-F56 series

Mast type
Double track mast to Tunnel bracket (see variants)
Section
Rolled beam
Height
11.5 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Catenary bracket set, Plus series

SampleOHE masts, cantilevers & catenary

Kalinga · KAL-686 series

Mast type
Portal 4-track to Booster mast (see variants)
Section
Tubular
Height
8 m
Steel grade
Fe 410
Galvanising
Hot-dip 610 g/m2

Lead time 4-6 weeks · Warranty 12 months · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

Steel structure for OHE, Max series

SampleOHE masts, cantilevers & catenary

Kalinga · KAL-1C7 series

Mast type
Single track mast to Booster mast (see variants)
Section
Rolled beam
Height
11.5 m
Steel grade
Fe 490
Galvanising
Hot-dip 610 g/m2

Lead time 8-12 weeks · Warranty 12 months · MOQ 10 nos

Price for verified buyers

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited