Remote control centre for traction, Pro seriesSample
by Kalinga Traction Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalinga Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Remote control centre for traction from Kalinga, Pro series: 4 control posts options between Up to 25 posts and Up to 250 posts. Design: sequence of events recording, energy and tariff reports and impedance fault locator. Suited to railway zones, industrial rail and freight corridors. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalinga
- Model
- KAL-EA3 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 20-28 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Door delivery in metro cities
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 25 postsKAL-EA3-01 | Control posts: Up to 25 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 50 postsKAL-EA3-02 | Control posts: Up to 50 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 100 postsKAL-EA3-03 | Control posts: Up to 100 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 250 postsKAL-EA3-04 | Control posts: Up to 250 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 25 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Distributed |
| RTU I/O | Per post |
| Communication | OFC / MPLS |
| Protocol | IEC 61850made to order: IEC 60870-5-104 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |