Remote terminal unit for TSS, Neo 9 seriesSample
by Kalinga Traction Power (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalinga Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Neo 9 range of remote terminal unit for TSS by Kalinga covers 3 control posts options (Up to 10 posts to Up to 50 posts). Key features: impedance fault locator, energy and tariff reports and sequence of events recording. Suited to industrial rail, metro traction control and freight corridors. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalinga
- Model
- KAL-279 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 10 lot
- Lead time
- 20-28 weeks
- Warranty
- 24 months
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR site, freight included
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsKAL-279-01 | Control posts: Up to 10 posts | 10 lot · 20-28 weeks | on quote |
| Control postsUp to 25 postsKAL-279-02 | Control posts: Up to 25 posts | 10 lot · 20-28 weeks | on quote |
| Control postsUp to 50 postsKAL-279-03 | Control posts: Up to 50 posts | 10 lot · 20-28 weeks | on quote |
Specifications
| Control posts | Up to 10 posts to Up to 50 posts (see variants) |
|---|---|
| Architecture | Redundant server |
| RTU I/O | Per post |
| Communication | GSM backup |
| Protocol | IEC 60870-5-104made to order: IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |