Catalogue / OHE masts, cantilevers & catenary
OHE mast, Pro 2 seriesSample
by Kalinga Traction Power (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kalinga Traction Power (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
OHE mast from Kalinga, Pro 2 series: 3 mast type options between Double track mast and Portal 4-track. Key features: designed per RDSO drawings, suitable for 25 kV AC traction and matching cantilever sets. Suited to industrial railway sidings, port railways and railway electrification. Designed and tested to RDSO TI/SPC/OHE, IS 800 and IS 2062. Lead time 4-6 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kalinga
- Model
- KAL-F85 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 4-6 weeks
- Warranty
- As per contract
- Standards
- RDSO TI/SPC/OHE, IS 800, IS 2062
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Mast typeDouble track mastKAL-F85-01 | Mast type: Double track mast | 10 nos · 4-6 weeks | for verified buyers |
| Mast typePortal 2-trackKAL-F85-02 | Mast type: Portal 2-track | 10 nos · 4-6 weeks | for verified buyers |
| Mast typePortal 4-trackKAL-F85-03 | Mast type: Portal 4-track | 10 nos · 4-6 weeks | for verified buyers |
Specifications
| Mast type | Double track mast to Portal 4-track (see variants) |
|---|---|
| Section | Rolled beam |
| Height | 11.5 m |
| Steel grade | Fe 490made to order: Fe 410 |
| Galvanising | Hot-dip 610 g/m2 |
| Mast bending moment | Per RDSO |
| Foundation | Concrete blockmade to order: Pile |
| Cantilever | Tubular, galvanised |
| Registration arm | Included |
| Insulator | Polymer or porcelain |
| Setting distance | 2.8 m |
| Fittings | Hot-dip galvanised |
| Welding | Certified welders |