Catalogue / Engineering & design
Substation and evacuation system design, Prime 6 seriesSample
by Kaverishikhar Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverishikhar Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Substation and evacuation system design from Kaverishikhar, Prime 6 series: 3 plant capacity options between 5 MW and 25 MW. Highlights: protection and relay coordination philosophy, yield and loss modelling aligned to bankable reports and cable sizing and voltage drop calculations. Suited to IPPs and developers, EPC contractors bidding for projects and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverishikhar
- Model
- KAV-A22 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-4 weeks
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWKAV-A22-01 | Plant capacity: 5 MW | 1 job · 3-4 weeks | on quote |
| Plant capacity10 MWKAV-A22-02 | Plant capacity: 10 MW | 1 job · 3-4 weeks | on quote |
| Plant capacity25 MWKAV-A22-03 | Plant capacity: 25 MW | 1 job · 3-4 weeks | on quote |
Specifications
| Plant capacity | 5 MW to 25 MW (see variants) |
|---|---|
| Deliverables | Full IFC drawing set with calculationsmade to order: GA drawings, SLD, BoQ / Design basis report plus drawings |
| Design software | PVsyst, AutoCAD, ETAP |
| Team | Electrical, civil and SCADA discipline leads |
| Turnaround | 10-12 weeks |
| Revisions included | 3 roundsmade to order: 2 rounds / Unlimited until approval |
| Authority submission support | Nonemade to order: CEA/CEIG drawing approval / DISCOM/STU drawing approval |
| Earthing and LA study | Optional add-on |
| Format | PDF and native CADmade to order: PDF, CAD and BIM model |
| Site visit | Desk design onlymade to order: One visit included / Two visits included |
| Payment milestones | 50% advance, 50% on deliverymade to order: 30% advance, 40% on drafts, 30% on IFC |