Catalogue / Engineering & design

No photo yet

Substation and evacuation system design, Prime 6 seriesSample

by Kaverishikhar Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kaverishikhar Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Substation and evacuation system design from Kaverishikhar, Prime 6 series: 3 plant capacity options between 5 MW and 25 MW. Highlights: protection and relay coordination philosophy, yield and loss modelling aligned to bankable reports and cable sizing and voltage drop calculations. Suited to IPPs and developers, EPC contractors bidding for projects and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kaverishikhar
Model
KAV-A22 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
3-4 weeks
Warranty
As per contract
Standards
CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity5 MWKAV-A22-01Plant capacity: 5 MW1 job · 3-4 weekson quote
Plant capacity10 MWKAV-A22-02Plant capacity: 10 MW1 job · 3-4 weekson quote
Plant capacity25 MWKAV-A22-03Plant capacity: 25 MW1 job · 3-4 weekson quote

Specifications

Plant capacity5 MW to 25 MW (see variants)
DeliverablesFull IFC drawing set with calculationsmade to order: GA drawings, SLD, BoQ / Design basis report plus drawings
Design softwarePVsyst, AutoCAD, ETAP
TeamElectrical, civil and SCADA discipline leads
Turnaround10-12 weeks
Revisions included3 roundsmade to order: 2 rounds / Unlimited until approval
Authority submission supportNonemade to order: CEA/CEIG drawing approval / DISCOM/STU drawing approval
Earthing and LA studyOptional add-on
FormatPDF and native CADmade to order: PDF, CAD and BIM model
Site visitDesk design onlymade to order: One visit included / Two visits included
Payment milestones50% advance, 50% on deliverymade to order: 30% advance, 40% on drafts, 30% on IFC

BARREL: Bharat Atom Renewable Resources Energy Limited