Merchants / KAVERISHIKHARTECHN

Kaverishikhar Technical Services (Sample)

Kaverishikhar Technical Services Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 18 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Installation & erection

Kaverishikhar · KAV-724 series

Installation scope
50 MW to 200 MW (see variants)
Scope
Structure and module installation
Manpower deployed
25 technicians per MW-block
Supervision
Project manager, engineers, QA/QC
Equipment
Pile driver, crane, telehandler

Lead time Phased by block · Warranty Defect liability 24 months · MOQ 1 MW

Price on quote

invoiced by BARREL

Request quote

Engineering & design

Kaverishikhar · KAV-A22 series

Plant capacity
5 MW to 25 MW (see variants)
Deliverables
Full IFC drawing set with calculations
Design software
PVsyst, AutoCAD, ETAP
Team
Electrical, civil and SCADA discipline leads
Turnaround
10-12 weeks

Lead time 3-4 weeks · Warranty As per contract · MOQ 1 job

Price on quote

invoiced by BARREL

Request quote

Surveys (topo, geotech, drone)

Transmission line route and profile survey, Flex series

SampleServiceSurveys (topo, geotech, drone)

Kaverishikhar · KAV-628 series

Survey area
25 acres to 1000 acres (see variants)
Survey method
Drone LiDAR
Accuracy
Horizontal 20 mm, vertical 30 mm
Deliverables
Orthomosaic, DSM and contours
Geotech boreholes
As per project requirement

Lead time Mobilisation in 5 days · Warranty Report validity for design purpose · MOQ 1 site

Price on quote

invoiced by BARREL

Request quote

Grid connectivity & GNA applications

LTA-to-GNA transition advisory, Xtra 8 series

SampleServiceGrid connectivity & GNA applications

Kaverishikhar · KAV-0B8 series

Capacity applied
10 MW to 500 MW (see variants)
Application
Connectivity
Scope
End-to-end liaison
Bank guarantee
Arranged by client
Studies
Detailed power system study

Lead time Grant 3-9 months · Warranty Rework of deficient applications · MOQ 1 application

Price on quote

invoiced by BARREL

Request quote

Cabling, trenching & HDD works

Kaverishikhar · KAV-B56 series

Cable route length
1 km to 50 km (see variants)
Method
Open trench
HDD capacity
Up to 250 mm bore
Trench depth
1.5 m
Cable type
LT armoured

Lead time Mobilisation in 7 days · Warranty Workmanship 12 months · MOQ 1 km

Price on quote

invoiced by BARREL

Request quote

Statutory approvals (CEIG, pollution, forest)

Power evacuation and local body approvals, Titan 9 series

SampleServiceStatutory approvals (CEIG, pollution, forest)

Kaverishikhar · KAV-D92 series

Approval package
3 approvals to Transmission project set (12) (see variants)
Approvals covered
Forest, wildlife and CRZ
Documentation
Drawing and application preparation
Liaison
Site inspection coordination
Statutory fee
Included

Lead time Approval 4-24 weeks · Warranty As per contract · MOQ 1 application

Price for verified buyers

invoiced by BARREL

Request quote

Project management (PMC) & owner's engineer

Construction supervision and QA/QC, Elite series

SampleServiceProject management (PMC) & owner's engineer

Kaverishikhar · KAV-A06 series

Project size
5 MW to 50 MW (see variants)
Scope
Design review and QA/QC
Team on site
1 project manager plus 1 engineer
Schedule control
Primavera P6 baseline and updates
Reporting
Weekly progress report

Lead time Deployment in 2 weeks · Warranty Professional indemnity cover · MOQ 1 month

Price for verified buyers

invoiced by BARREL

Request quote

Transmission line erection & stringing

66 kV and 132 kV line construction, Prime series

SampleServiceTransmission line erection & stringing

Kaverishikhar · KAV-7B9 series

Voltage level
66 kV to 765 kV (see variants)
Circuit type
Single circuit
Conductor
ACSR Panther
Scope
Erection and stringing only
Stringing method
Tension stringing

Lead time Per section schedule · Warranty Workmanship 12 months · MOQ 1 km

Price on quote

invoiced by BARREL

Request quote

Testing & commissioning

Kaverishikhar · KAV-9A5 series

Plant capacity
10 MW to 50 MW (see variants)
Tests covered
Full plant functional and PR test
Instruments
Calibrated IV tracer, megger, CRM
Calibration
NABL traceable certificates
Team
Commissioning engineer plus 2 testers

Lead time 1-2 weeks on site · Warranty As per contract · MOQ 1 MW

Price for verified buyers

invoiced by BARREL

Request quote

EPC / turnkey contracting

BESS integrated solar EPC, Elite series

SampleServiceEPC / turnkey contracting

Kaverishikhar · KAV-C21 series

Project capacity
25 MWp to 300 MWp (see variants)
Scope
Design, supply, install, commission
Module technology
Mono PERC DCR
Inverter
Central inverter
Performance guarantee
PR 80% for first year

Lead time 3-6 months to commissioning · Warranty Inverter 5-10 years · MOQ 1 MWp

Price for verified buyers

invoiced by BARREL

Request quote

Civil & foundation works

Wind turbine foundation construction, Core 9 series

SampleServiceCivil & foundation works

Kaverishikhar · KAV-256 series

Works volume
1 MW equivalent to 100 MW equivalent (see variants)
Foundation type
Driven steel pile
Concrete grade
M25
Pull-out testing
Random test plus lateral load
Reinforcement
Fe 550D

Lead time Mobilisation in 10 days · Warranty Pile load test certified · MOQ 1 job

Price for verified buyers

invoiced by BARREL

Request quote

Title search & land documentation

Title search and legal opinion for land parcels, Prime series

SampleServiceTitle search & land documentation

Kaverishikhar · KAV-2F7 series

Parcels covered
5 parcels to 100 parcels (see variants)
Search depth
60 years
Deliverables
Title opinion
Records checked
Court and RERA databases
Registration
Drafting only

Lead time Batch 2-6 weeks · Warranty Opinion valid as on search date · MOQ 1 case

Price on quote

invoiced by BARREL

Request quote

Right of way (RoW) & compensation

Kaverishikhar · KAV-8C2 series

Line length
5 km to 100 km (see variants)
Scope
Survey and valuation
Compensation basis
Market value assessment
Records
Photographic evidence
Grievance handling
Field team

Lead time Mobilisation in 2-3 weeks · Warranty As per contract · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Solar & wind BoP construction

Wind farm BoP and internal electrical works, Elite 4 series

SampleServiceSolar & wind BoP construction

Kaverishikhar · KAV-8C5 series

Project size
10 MW to 100 MW (see variants)
Scope
Cabling and earthing
DC cables
4 sq mm solar cable
MV cables
33 kV XLPE Al armoured
Inverter station
Skid or containerised

Lead time Mobilisation in 14 days · Warranty Defect liability 24 months · MOQ 1 MW

Price for verified buyers

invoiced by BARREL

Request quote

Land identification & aggregation

Land identification for solar and wind projects, Prime 8 series

SampleServiceLand identification & aggregation

Kaverishikhar · KAV-9F4 series

Land requirement
50 acres to 2500 acres (see variants)
Land type
Barren government land
Acquisition mode
Long-term lease
Screening
Slope, shading, flood and grid proximity
Documents
7/12 extracts, mutation, maps

Lead time Aggregation 3-9 months · Warranty Replacement of failed parcels · MOQ 1 acre

Price for verified buyers

invoiced by BARREL

Request quote

Government land allotment support, Duo 3 series

SampleServiceLand identification & aggregation

Kaverishikhar · KAV-2F7 series

Land requirement
100 acres to 2500 acres (see variants)
Land type
Private agricultural land
Acquisition mode
Long-term lease
Screening
Forest and eco-sensitive screening
Documents
7/12 extracts, mutation, maps

Lead time Shortlist in 3-6 weeks · Warranty Replacement of failed parcels · MOQ 1 acre

Price on quote

invoiced by BARREL

Request quote

Open-access approvals

Kaverishikhar · KAV-BB8 series

Contract demand
5 MW to 50 MW (see variants)
Access type
Short term
Scope
Application and follow-up
Approvals
DISCOM and STU
Charges analysis
Landed cost workings

Lead time Approval in 15-90 days · Warranty Rework for deficient applications · MOQ 1 application

Price on quote

invoiced by BARREL

Request quote

Substation construction

Switchyard erection and bus bar works, Eco series

SampleServiceSubstation construction

Kaverishikhar · KAV-092 series

Voltage class
33 kV to 400 kV (see variants)
Type
Indoor GIS
Scope
Full turnkey
Transformers
Up to 160 MVA
Earthing
Copper-bonded rods

Lead time Execution 6-15 months · Warranty Defect liability 24 months · MOQ 1 bay

Price on quote

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited