Catalogue / Grid connectivity & GNA applications
LTA-to-GNA transition advisory, Xtra 8 seriesSample
by Kaverishikhar Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverishikhar Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Xtra 8 service of LTA-to-GNA transition advisory by Kaverishikhar covers 5 capacity applied options (10 MW to 500 MW). Design: support for relinquishment and transfer, regular updates of queue status and eligibility check before filing. Typically used for green hydrogen projects, industrial captive generators and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverishikhar
- Model
- KAV-0B8 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWKAV-0B8-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied50 MWKAV-0B8-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied100 MWKAV-0B8-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied250 MWKAV-0B8-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWKAV-0B8-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 500 MW (see variants) |
|---|---|
| Application | Connectivity |
| Scope | End-to-end liaisonmade to order: Document preparation and filing |
| Bank guarantee | Arranged by client |
| Studies | Detailed power system studymade to order: Grid impact summary |
| Portal handling | STU portal |
| Team | Dedicated manager |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | SLD, land proof, board resolution |
| Queries | Responded within 2 days |
| Fee basis | Fixed plus successmade to order: Fixed |