Catalogue / Cabling, trenching & HDD works
Cable trenching and laying for power and control cables, Prime seriesSample
by Kaverishikhar Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kaverishikhar Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Kaverishikhar Prime cable trenching and laying for power and control cables, offered in 6 cable route length options from 1 km to 50 km. Design: traffic management at crossings, drum handling and pulling tension control and dewatering in high water table. Used by railway and highway crossings, industrial plant cabling and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kaverishikhar
- Model
- KAV-B56 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmKAV-B56-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length2 kmKAV-B56-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length5 kmKAV-B56-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmKAV-B56-04 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length20 kmKAV-B56-05 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
| Cable route length50 kmKAV-B56-06 | Cable route length: 50 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 1 km to 50 km (see variants) |
|---|---|
| Method | Open trenchmade to order: Trenchless HDD / Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 1.5 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Road and footpath restorationmade to order: Backfill and compaction only |
| Permissions | Contractor arranges road cut approvalsmade to order: Client arranges |
| Testing | Hipot and sheath testmade to order: Insulation and VLF test |
| Productivity | 300 m per day open trenchmade to order: 50 m per day HDD |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |