Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Satellite based long-term solar irradiance study, Eco 5 seriesSample

by Krishnavayu Infra Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Krishnavayu Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Satellite based long-term solar irradiance study from Krishnavayu, Eco 5 series: 4 measurement duration options between 3 months and 18 months. Design: data quality control and filling, extreme wind and wake studies and loss factors for local conditions. Typically used for wind and solar developers, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Krishnavayu
Model
KRI-B52 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
As per contract
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement duration3 monthsKRI-B52-01Measurement duration: 3 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration6 monthsKRI-B52-02Measurement duration: 6 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration12 monthsKRI-B52-03Measurement duration: 12 months1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration18 monthsKRI-B52-04Measurement duration: 18 months1 report · Campaign 3-24 monthsfor verified buyers

Specifications

Measurement duration3 months to 18 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceOn-site measurement
EquipmentClass A pyranometer station
UncertaintyBankable assessment
ModellingPVsyst, SAM
DeliverableResource report
CalibrationCalibration pre and post campaignmade to order: Traceable calibration
Site countMulti-site comparison
MaintenanceQuarterly site visit
TurnaroundReport in 3 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited