Merchants / KRISHNAVAYUINFRASE

Krishnavayu Infra Services (Sample)

Krishnavayu Infra Services Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 11 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Technical, legal & financial due diligence

Legal due diligence for acquisition, Xtra 7 series

SampleServiceTechnical, legal & financial due diligence

Krishnavayu · KRI-FC3 series

Portfolio size
25 MW to 100 MW (see variants)
Scope
Legal
Site visit
All sites above 10 MW
Legal items
Litigation and compliance check
Financial items
Revenue, receivables, tax

Lead time 3-8 weeks · Warranty Professional indemnity · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Legal due diligence for acquisition, Edge series

SampleServiceTechnical, legal & financial due diligence

Krishnavayu · KRI-FC2 series

Portfolio size
25 MW to 1 GW (see variants)
Scope
Legal
Site visit
Sample sites
Legal items
Litigation and compliance check
Financial items
Revenue, receivables, tax

Lead time Kick-off in 1 week · Warranty Professional indemnity · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Resource assessment (solar, wind, hydro)

Satellite based long-term solar irradiance study, Eco 5 series

SampleServiceResource assessment (solar, wind, hydro)

Krishnavayu · KRI-B52 series

Measurement duration
3 months to 18 months (see variants)
Technology
Small hydro
Data source
On-site measurement
Equipment
Class A pyranometer station
Uncertainty
Bankable assessment

Lead time Desktop in 2-3 weeks · Warranty As per contract · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Satellite based long-term solar irradiance study, Prime series

SampleServiceResource assessment (solar, wind, hydro)

Krishnavayu · KRI-B51 series

Measurement duration
6 months to 24 months (see variants)
Technology
Small hydro
Data source
Satellite and reanalysis
Equipment
Class A pyranometer station
Uncertainty
Bankable assessment

Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Feasibility studies & DPR

Green hydrogen project feasibility, Ultra series

SampleServiceFeasibility studies & DPR

Krishnavayu · KRI-CD4 series

Project capacity
50 MW to 1 GW (see variants)
Scope
Feasibility with financial model
Energy yield
WAsP wind energy assessment
Financial model
Sensitivity and tariff analysis
Grid assessment
Nearest substation capacity check

Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Green hydrogen project feasibility, Elite series

SampleServiceFeasibility studies & DPR

Krishnavayu · KRI-CD3 series

Project capacity
10 MW to 100 MW (see variants)
Scope
Pre-feasibility
Energy yield
WAsP wind energy assessment
Financial model
Sensitivity and tariff analysis
Grid assessment
GNA/connectivity route study

Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

EIA, ESG & environmental studies

Environmental impact assessment for power projects, Flex series

SampleServiceEIA, ESG & environmental studies

Krishnavayu · KRI-FC3 series

Project scale
Under 25 MW to 1 GW (see variants)
Study
Comprehensive EIA
Baseline season
Three seasons
Deliverables
Draft EIA, EMP, public hearing support
Lab testing
NABL accredited lab

Lead time 8-12 weeks, longer with seasonal baseline · Warranty Query response with regulators at no cost · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Environmental impact assessment for power projects, Prime series

SampleServiceEIA, ESG & environmental studies

Krishnavayu · KRI-FC4 series

Project scale
Under 25 MW to 250 MW (see variants)
Study
Comprehensive EIA
Baseline season
One season
Deliverables
Draft EIA, EMP, public hearing support
Lab testing
NABL accredited lab

Lead time 8-12 weeks, longer with seasonal baseline · Warranty Query response with regulators at no cost · MOQ 1 report

Price on quote

invoiced by BARREL

Request quote

Lender's engineer & TEV studies

Construction monitoring for lenders, Smart series

SampleServiceLender's engineer & TEV studies

Krishnavayu · KRI-EC1 series

Project cost
INR 100 crore to INR 2500 crore (see variants)
Phase
Pre-financing TEV
Scope
Contract and permit review
Reporting
TEV report
Site visits
Monthly

Lead time Appointment in 1 week · Warranty Professional indemnity · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Power system studies (load flow, short circuit, grid code)

Protection coordination and relay setting, Volt 4 series

SampleServicePower system studies (load flow, short circuit, grid code)

Krishnavayu · KRI-F11 series

Network scale
11 kV plant to 400 kV system (see variants)
Study type
Load flow and short circuit
Software
ETAP
Model data
Client single line diagram and data
Deliverables
Model files and relay settings

Lead time 2-6 weeks · Warranty Clarifications to utility at no cost · MOQ 1 report

Price for verified buyers

invoiced by BARREL

Request quote

Tariff & regulatory advisory

Intervention in regulatory proceedings, Elite series

SampleServiceTariff & regulatory advisory

Krishnavayu · KRI-CA2 series

Matter complexity
Advisory note to Appeal before APTEL (see variants)
Forum
State Electricity Regulatory Commission
Deliverable
Opinion note
Representation
Drafting only
Data support
Cost data and tariff model

Lead time Petition 4-8 weeks · Warranty Free redrafting if Commission raises defects · MOQ 1 case

Price on quote

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited