Catalogue / Resource assessment (solar, wind, hydro)
Satellite based long-term solar irradiance study, Prime seriesSample
by Krishnavayu Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Krishnavayu Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Prime service of satellite based long-term solar irradiance study by Krishnavayu covers 4 measurement duration options (6 months to 24 months). Highlights: data quality control and filling, extreme wind and wake studies and loss factors for local conditions. Used by wind and solar developers, lenders needing P90 and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Krishnavayu
- Model
- KRI-B51 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration6 monthsKRI-B51-01 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration12 monthsKRI-B51-02 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | on quote |
| Measurement duration18 monthsKRI-B51-03 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration24 monthsKRI-B51-04 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | 6 months to 24 months (see variants) |
|---|---|
| Technology | Small hydromade to order: Solar GHI/DNI / Wind |
| Data source | Satellite and reanalysismade to order: On-site measurement / Hybrid with MCP |
| Equipment | Class A pyranometer stationmade to order: 80-120 m met mast with LiDAR |
| Uncertainty | Bankable assessmentmade to order: P50/P90 with uncertainty budget |
| Modelling | WAsP, WindPRO |
| Deliverable | Hourly time series dataset |
| Calibration | Calibration pre and post campaign |
| Site count | Multi-site comparisonmade to order: Single site |
| Maintenance | Quarterly site visit |
| Turnaround | Report within 6 weeks of data |