Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Satellite based long-term solar irradiance study, Prime seriesSample

by Krishnavayu Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Krishnavayu Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Prime service of satellite based long-term solar irradiance study by Krishnavayu covers 4 measurement duration options (6 months to 24 months). Highlights: data quality control and filling, extreme wind and wake studies and loss factors for local conditions. Used by wind and solar developers, lenders needing P90 and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Krishnavayu
Model
KRI-B51 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement duration6 monthsKRI-B51-01Measurement duration: 6 months1 report · Desktop in 2-3 weekson quote
Measurement duration12 monthsKRI-B51-02Measurement duration: 12 months1 report · Desktop in 2-3 weekson quote
Measurement duration18 monthsKRI-B51-03Measurement duration: 18 months1 report · Campaign 3-24 monthson quote
Measurement duration24 monthsKRI-B51-04Measurement duration: 24 months1 report · Campaign 3-24 monthson quote

Specifications

Measurement duration6 months to 24 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceSatellite and reanalysismade to order: On-site measurement / Hybrid with MCP
EquipmentClass A pyranometer stationmade to order: 80-120 m met mast with LiDAR
UncertaintyBankable assessmentmade to order: P50/P90 with uncertainty budget
ModellingWAsP, WindPRO
DeliverableHourly time series dataset
CalibrationCalibration pre and post campaign
Site countMulti-site comparisonmade to order: Single site
MaintenanceQuarterly site visit
TurnaroundReport within 6 weeks of data

BARREL: Bharat Atom Renewable Resources Energy Limited