Catalogue / Grid connectivity & GNA applications
LTA-to-GNA transition advisory, Duo 6 seriesSample
by Kutch Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Kutch Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
LTA-to-GNA transition advisory from Kutch, Duo 6 series: 5 capacity applied options between 10 MW and 500 MW. Design: bank guarantee timeline tracking, handling of CTU queries and support for relinquishment and transfer. Used by storage developers, industrial captive generators and renewable developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Kutch
- Model
- KUT-0B2 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWKUT-0B2-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied50 MWKUT-0B2-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWKUT-0B2-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWKUT-0B2-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWKUT-0B2-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 10 MW to 500 MW (see variants) |
|---|---|
| Application | Bothmade to order: Connectivity / GNA |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged through partner bankmade to order: Arranged by client |
| Studies | Detailed power system studymade to order: Grid impact summary |
| Portal handling | CTUIL portalmade to order: STU portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Approval 3-6 months |
| Technical documents | SLD, land proof, board resolutionmade to order: Switchyard layout and GA drawings |
| Queries | Responded within 2 days |
| Fee basis | Fixed plus successmade to order: Fixed |