Merchants / KUTCHENGINEERINGSE

Kutch Engineering Services (Sample)

Kutch Engineering Services Pvt Ltd (Sample)

Verified by BARREL — PAN, GSTIN and company records checked; NDA and non-circumvention signed

Catalogue · 21 listings

Send an RFQ

Prices are shown to verified buyers. Register your company to see them and request quotes. Questions, quotes, orders and invoices all go through BARREL Shop.

Solar plant O&M & module cleaning

Robotic and waterless module cleaning, Duo 8 series

SampleServiceSolar plant O&M & module cleaning

Kutch · KUT-661 series

Plant capacity
25 MWp to 250 MWp (see variants)
Scope
O&M plus asset management
Cleaning method
Semi-automatic wet
Cleaning frequency
Fortnightly
Availability guarantee
Plant availability 99%

Lead time Takeover in 2-3 weeks · Warranty Service credits as per contract · MOQ 1 MWp

Price on quote

invoiced by BARREL

Request quote

Inverter and SCADA maintenance, Elite series

SampleServiceSolar plant O&M & module cleaning

Kutch · KUT-622 series

Plant capacity
5 MWp to 25 MWp (see variants)
Scope
O&M plus asset management
Cleaning method
Semi-automatic wet
Cleaning frequency
Fortnightly
Availability guarantee
Grid availability 99.5%

Lead time Baseline audit before takeover · Warranty Service credits as per contract · MOQ 1 MWp

Price for verified buyers

invoiced by BARREL

Request quote

Substation & line O&M

Power transformer routine checks, Titan series

SampleServiceSubstation & line O&M

Kutch · KUT-056 series

Voltage level
66 kV to 400 kV (see variants)
Scope
Operation and maintenance
Shift pattern
General shift plus on-call
Manpower
Engineer plus 6 operators
Line patrolling
Quarterly drone patrol

Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month

Price for verified buyers

invoiced by BARREL

Request quote

Kutch · KUT-729 series

Voltage level
11 kV to 132 kV (see variants)
Scope
Operation, maintenance and statutory compliance
Shift pattern
General shift plus on-call
Manpower
Engineer plus 6 operators
Line patrolling
Monthly foot patrol

Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month

Price on quote

invoiced by BARREL

Request quote

Live-line & hot-line washing

Robotic and drone insulator cleaning, Duo 6 series

SampleServiceLive-line & hot-line washing

Kutch · KUT-3C4 series

Voltage level
11 kV to 132 kV (see variants)
Method
Robotic cleaning
Resistivity of water
Demineralised water
Scope
Per km of line
Frequency
Pre- and post-monsoon

Lead time Permit based scheduling · Warranty As per contract · MOQ 1 job

Price for verified buyers

invoiced by BARREL

Request quote

Title search & land documentation

Land lease deed drafting and registration, Xtra series

SampleServiceTitle search & land documentation

Kutch · KUT-F34 series

Parcels covered
1 parcel to 50 parcels (see variants)
Search depth
Back to root of title
Deliverables
Title opinion
Records checked
Sub-registrar and revenue records
Registration
Drafting plus registration support

Lead time Batch 2-6 weeks · Warranty Professional indemnity · MOQ 1 case

Price for verified buyers

invoiced by BARREL

Request quote

Encumbrance and litigation search, Edge 2 series

SampleServiceTitle search & land documentation

Kutch · KUT-CE2 series

Parcels covered
5 parcels to 100 parcels (see variants)
Search depth
60 years
Deliverables
Opinion with chain of title and encumbrance
Records checked
Court and RERA databases
Registration
Drafting only

Lead time Batch 2-6 weeks · Warranty Professional indemnity · MOQ 1 case

Price on quote

invoiced by BARREL

Request quote

Grid connectivity & GNA applications

Connectivity application to STU, Ultra series

SampleServiceGrid connectivity & GNA applications

Kutch · KUT-666 series

Capacity applied
100 MW to 1000 MW (see variants)
Application
GNA
Scope
End-to-end liaison
Bank guarantee
Arranged through partner bank
Studies
Grid impact summary

Lead time Filing in 1-2 weeks · Warranty As per contract · MOQ 1 application

Price for verified buyers

invoiced by BARREL

Request quote

LTA-to-GNA transition advisory, Duo 6 series

SampleServiceGrid connectivity & GNA applications

Kutch · KUT-0B2 series

Capacity applied
10 MW to 500 MW (see variants)
Application
Both
Scope
Document preparation and filing
Bank guarantee
Arranged through partner bank
Studies
Detailed power system study

Lead time Grant 3-9 months · Warranty As per contract · MOQ 1 application

Price for verified buyers

invoiced by BARREL

Request quote

AMC & breakdown services

Breakdown and emergency repair service, Edge 9 series

SampleServiceAMC & breakdown services

Kutch · KUT-216 series

Equipment value covered
INR 10 lakh to INR 5 crore (see variants)
Coverage
Preventive plus breakdown labour
Visits
2 per year
Response time
8 hours
Spare parts
Consumables only

Lead time Start within 1 week · Warranty Parts replaced covered for 6 months · MOQ 1 job

Price on quote

invoiced by BARREL

Request quote

DG set and UPS maintenance contract, Eco series

SampleServiceAMC & breakdown services

Kutch · KUT-019 series

Equipment value covered
INR 25 lakh to INR 5 crore (see variants)
Coverage
Preventive visits only
Visits
Monthly
Response time
4 hours
Spare parts
Consumables only

Lead time Start within 1 week · Warranty SLA service credits · MOQ 1 job

Price for verified buyers

invoiced by BARREL

Request quote

Land identification & aggregation

Land aggregation from private owners, Core 8 series

SampleServiceLand identification & aggregation

Kutch · KUT-096 series

Land requirement
25 acres to 500 acres (see variants)
Land type
Private agricultural land
Acquisition mode
Purchase
Screening
Forest and eco-sensitive screening
Documents
7/12 extracts, mutation, maps

Lead time Shortlist in 3-6 weeks · Warranty As per contract · MOQ 1 acre

Price on quote

invoiced by BARREL

Request quote

Site screening with revenue records, Ultra 8 series

SampleServiceLand identification & aggregation

Kutch · KUT-617 series

Land requirement
100 acres to 2500 acres (see variants)
Land type
Private agricultural land
Acquisition mode
Long-term lease
Screening
Forest and eco-sensitive screening
Documents
Revenue records and survey numbers

Lead time Aggregation 3-9 months · Warranty Replacement of failed parcels · MOQ 1 acre

Price for verified buyers

invoiced by BARREL

Request quote

Statutory approvals (CEIG, pollution, forest)

Aviation, defence and railway NOCs, Prime series

SampleServiceStatutory approvals (CEIG, pollution, forest)

Kutch · KUT-529 series

Approval package
Single NOC to Transmission project set (12) (see variants)
Approvals covered
CEIG, DISCOM, MPCB-type consent
Documentation
Drawing and application preparation
Liaison
Site inspection coordination
Statutory fee
Included

Lead time Filing in 1-2 weeks · Warranty As per contract · MOQ 1 application

Price on quote

invoiced by BARREL

Request quote

Wind turbine O&M

Kutch · KUT-1B9 series

Fleet size
5 turbines to 150 turbines (see variants)
Scope
Comprehensive including spares
Turbine class
Up to 1.5 MW
Availability guarantee
95% machine availability
Technician team
Site manager plus 2 technicians per 5 turbines

Lead time Takeover in 4-6 weeks · Warranty Availability guarantee with LD · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Kutch · KUT-248 series

Fleet size
10 turbines to 80 turbines (see variants)
Scope
Comprehensive including spares
Turbine class
3 MW and above
Availability guarantee
97% availability
Technician team
Site manager plus 2 technicians per 5 turbines

Lead time Takeover in 4-6 weeks · Warranty Availability guarantee with LD · MOQ 1 nos

Price on quote

invoiced by BARREL

Request quote

Transformer overhaul & oil filtration

Power transformer overhaul and oil reconditioning, Xtra 4 series

SampleServiceTransformer overhaul & oil filtration

Kutch · KUT-4C9 series

Transformer rating
1 MVA to 100 MVA (see variants)
Service
Full overhaul with rewinding
Filtration machine
Vacuum dehydration 6000 L/hr
Oil BDV target
Above 60 kV
Moisture target
Below 10 ppm

Lead time Mobilisation in 3-5 days · Warranty Oil quality guarantee 6 months · MOQ 1 nos

Price for verified buyers

invoiced by BARREL

Request quote

Right of way (RoW) & compensation

Landowner engagement for transmission lines, Prime 3 series

SampleServiceRight of way (RoW) & compensation

Kutch · KUT-E49 series

Line length
50 km to 200 km (see variants)
Scope
Full RoW clearance
Compensation basis
Market value assessment
Records
Tower-wise landowner register
Grievance handling
Dedicated desk

Lead time Mobilisation in 2-3 weeks · Warranty As per contract · MOQ 1 km

Price for verified buyers

invoiced by BARREL

Request quote

Thermography & condition monitoring

Drone thermal inspection of solar plants, Flex series

SampleServiceThermography & condition monitoring

Kutch · KUT-F94 series

Asset size
5 MW to 100 MW (see variants)
Technique
Drone thermal imaging
Camera resolution
1280x1024 radiometric
Deliverable
Annotated hotspot report
Drone services
Orthomosaic of full plant

Lead time Report in 5-10 days · Warranty Report accuracy as per method · MOQ 1 site

Price on quote

invoiced by BARREL

Request quote

Online partial discharge and UV corona inspection, Plus series

SampleServiceThermography & condition monitoring

Kutch · KUT-B22 series

Asset size
1 MW to 100 MW (see variants)
Technique
Drone thermal imaging
Camera resolution
1280x1024 radiometric
Deliverable
Annotated hotspot report
Drone services
Ground sampling 3 cm per pixel

Lead time Report in 5-10 days · Warranty Re-scan of repaired points at no cost · MOQ 1 site

Price for verified buyers

invoiced by BARREL

Request quote

Open-access approvals

Short-term open access registration, Pro 9 series

SampleServiceOpen-access approvals

Kutch · KUT-024 series

Contract demand
10 MW to 100 MW (see variants)
Access type
Long term
Scope
Application and follow-up
Approvals
DISCOM and STU
Charges analysis
Landed cost workings

Lead time Approval in 15-90 days · Warranty As per contract · MOQ 1 application

Price on quote

invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited