Catalogue / Wind turbine O&M

No photo yet

Gearbox, blade and yaw system servicing, Titan 3 seriesSample

by Kutch Engineering Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Kutch Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Kutch Titan 3 gearbox, blade and yaw system servicing, offered in 4 fleet size options from 10 turbines to 80 turbines. Design: scheduled 6-monthly and annual services, energy loss and curtailment analysis and crane mobilisation planning. Suited to wind farm owners post warranty, aggregators of old fleets and captive wind generators. Delivered in line with IEC 61400-1, IEC 61400-25 and CEA (Measures relating to Safety) Regulations. Mobilisation Takeover in 4-6 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Kutch
Model
KUT-248 series
Listing type
Service
Unit
nos
Minimum order
1 nos
Lead time
Takeover in 4-6 weeks
Warranty
Availability guarantee with LD
Standards
IEC 61400-1, IEC 61400-25, CEA (Measures relating to Safety) Regulations
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Fleet size10 turbinesKUT-248-01Fleet size: 10 turbines1 nos · Takeover in 4-6 weekson quote
Fleet size20 turbinesKUT-248-02Fleet size: 20 turbines1 nos · Takeover in 4-6 weekson quote
Fleet size40 turbinesKUT-248-03Fleet size: 40 turbines1 nos · Mobilisation of crew 2 weekson quote
Fleet size80 turbinesKUT-248-04Fleet size: 80 turbines1 nos · Mobilisation of crew 2 weekson quote

Specifications

Fleet size10 turbines to 80 turbines (see variants)
ScopeComprehensive including spares
Turbine class3 MW and abovemade to order: Up to 1.5 MW / 2-2.5 MW
Availability guarantee97% availabilitymade to order: 95% machine availability
Technician teamSite manager plus 2 technicians per 5 turbines
Blade inspectionSemi-annual with repairs
Gearbox oilAnnual samplingmade to order: Quarterly sampling and filtration
Major componentsExcluded
MonitoringVibration based CMS
Response12 hours for faults
Term1 year

BARREL: Bharat Atom Renewable Resources Energy Limited